States › Rhode Island

Coventry Greenway

Rail-trail in Rhode Island · OpenStreetMap relation

Runs through Coventry · Kent County

Conditions now

Loading the weather near Warwick…

Forecast by the National Weather Service for Warwick · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Brenda Drive mile 0.1 directions to trailhead 1
  2. Washington Secondary Rail Trail Parking mile 0.8 directions to Washington Secondary Rail Trail Parking
  3. Parking at Fairway Drive mile 1.5 directions to trailhead 3
  4. Parking at Fairway Drive mile 1.6 directions to trailhead 4
  5. Washington Secondary Rail Trail Parking mile 1.7 directions to Washington Secondary Rail Trail Parking
  6. Washington Secondary Rail Trail Parking mile 1.7 directions to Washington Secondary Rail Trail Parking
  7. Parking at Main Street mile 1.8 directions to trailhead 7
  8. Parking at Sandy Bottom Road mile 1.9 directions to trailhead 8
  9. Parking at Whipple Court mile 2 directions to trailhead 9
  10. Parking at Washington Street mile 2.2 directions to trailhead 10
  11. Washington Secondary Rail Trail Parking mile 2.6 directions to Washington Secondary Rail Trail Parking
  12. Parking at Washington Street mile 3 directions to trailhead 12
  13. Parking at Washington Street mile 3.1 directions to trailhead 13
  14. Parking at Washington Street mile 3.1 directions to trailhead 14
Washington Secondary Rail Trail, Anthony RI (opens in a new tab)
Washington Secondary Rail Trail, Anthony RI · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Coventry Greenway is the Coventry, Rhode Island, section of the Washington Secondary Bike Path, the 19-mile paved path from Cranston Street in Cranston to Log Bridge Road in western Coventry; this record maps about 3.4 miles of it. It follows the Washington Secondary line, built in the 1840s by the Hartford, Providence and Fishkill Railroad and later the New Haven's Willimantic Branch; the Providence and Worcester Railroad sold the five-mile section in eastern Coventry to the town. Station Street to Ayoho Road opened in 1997, Ayoho Road to Town Farm Road in 1998 and Station Street to Whitford Street in 2010; the original segments were rehabilitated in 2014. Parking includes Station Street and the Coventry Recreation Center.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Providence T F Green Airport, 11.5 km from the trail's middle, 56 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384048596978848275645343
Low °F222430404959656456453628
Precipitation, in43.44.94.33.43.82.93.64.24.24.34.7
Snow, in10.310.56.40.6000000.217.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kent sheet (1:62,500); the 1955 Crompton sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5446562, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Washington Secondary Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026
    Supports: 19 miles Cranston Street to Log Bridge Road, Coventry Greenway as a named segment, segment openings 1997, 1998 and 2010, 2014 rehabilitation, parking at Pilgrim Avenue, Station Street and the Coventry Recreation Center
  3. The Coventry Greenway — Town of Coventry · government source · checked Oct 13, 2026
    Supports: Washington Secondary built in the 1840s by the Hartford, Providence and Fishkill Railroad, later the New Haven's Willimantic Branch, Providence and Worcester sale of the five-mile eastern Coventry section to the town

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.