States › Indiana

Covington Road Trail

Greenway in Indiana

Runs through Fort Wayne · Allen County

Conditions now

Loading the weather near Fort Wayne…

Forecast by the National Weather Service for Fort Wayne · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.9 mi 6.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Covington Road mile 0.6 directions to trailhead 1
  2. Parking at West Hamilton Road South mile 3.6 directions to trailhead 2
  3. Parking at Covington Road mile 3.6 directions to trailhead 3
Fort Wayne, along the trail (opens in a new tab)
Fort Wayne, along the trail · Photo: Momoneymoproblemz · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Covington Road Trail is a 4.7-mile multi-use trail along Covington Road in Fort Wayne, Indiana, and part of the 28.8 miles of trail in the Aboite Trails Network. It is a roadside greenway, not a rail-trail. The City of Fort Wayne and the Indiana Department of Transportation built it in eight phases between 2009 and 2025, and the city announced its completion on October 30, 2025. According to the city, the trail serves 4,024 homes and apartments, 373 businesses and eight schools.

The trail gives residents access to the schools from West Hamilton Road to Hadley Road. The final phase added 0.9 mile at the east end, between Hadley Road and Getz Road, built from the Durnell Drain east to Getz Road and then back between Hadley Road and the drain, with a pedestrian bridge over the Durnell Drain. Substantial completion was set for December 6, 2024, and final completion, including setting the bridge and restoration, for April 25, 2025. At the east end the trail reaches Covington Plaza and Time Corners and connects to a sidewalk on the east side of Getz Road toward the Illinois Road corridor. The record maps about 3.9 miles of trail starting at West Hamilton Road.

WANE reported that the city and Fort Wayne Trails planned a trail hub rest area and trailhead parking at 7014 Covington Road for 2025, paid for by donors; whether it has been built was not confirmed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ft Wayne International Airport, 11.6 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333648617281848276644938
Low °F182129395060646153433324
Precipitation, in2.52.12.83.74.64.543.83332.5
Snow, in10.87.84.60.8000000.11.97.6
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1961 Arcola sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Fort Wayne announces completion of Covington Road Trail — 21Alive (WPTA) · press · checked Oct 15, 2026
    Supports: 4.7 miles; part of 28.8 miles of trail in the Aboite Trails Network; built by the City of Fort Wayne and INDOT in eight phases, 2009-2025; completion announced October 30, 2025; serves 4,024 homes and apartments, 373 businesses and eight schools
  3. Covington Road Trail project will result in 2 month road closure — WANE 15 · web · checked Oct 15, 2026
    Supports: final 0.9 mile between Hadley Road and Getz Road; construction sequence from the Durnell Drain to Getz Road, then Hadley Road to the drain; pedestrian bridge over the Durnell Drain; substantial completion 12/6/24, final completion 4/25/25; access to schools along West Hamilton Road to Hadley Road; connections to Covington Plaza, Time Corners and the Getz Road sidewalk toward the Illinois Road corridor; planned 2025 trail hub rest area and trailhead parking at 7014 Covington Road with Fort Wayne Trails, donor funded
  4. OpenStreetMap ways named Covington Road Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped length of about 3.9 miles starting at West Hamilton Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.