States › Missouri

Crushed Limestone Trail

Greenway in Missouri

Runs through St. Joseph · Buchanan County

Conditions now

Loading the weather near St. Joseph…

Forecast by the National Weather Service for St. Joseph · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.3 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. River Bluff Trails South Trailhead mile 0 · restrooms directions to River Bluff Trails South Trailhead
  2. River Bluff Trails West Highland Avenue Trailhead mile 0.3 · restrooms directions to River Bluff Trails West Highland Avenue Trailhead
  3. River Bluff Trails North Trailhead mile 2 · restrooms directions to River Bluff Trails North Trailhead
Saint Joseph, along the trail (opens in a new tab)
Saint Joseph, along the trail · Photo: Tim Kiser (w:User:Malepheasant) · CC BY-SA 2.5 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Crushed Limestone Trail is a wide, hard-surface crushed-limestone path along the top of the Missouri River bluffs in River Bluff Trails Park, St. Joseph, Missouri. It is not a rail-trail. The park was built by the City of St. Joseph as part of its Riverfront Master Plan: the City Council approved a project of more than $1.5 million in 2021 to design and build mountain-bike and hiking trails on the bluffs, including the crushed-limestone path, which a local advocate said would be open to walkers, hikers, trail runners and others. The park opened with a ribbon cutting on Memorial Day weekend 2022; Terrain Magazine reported the project at $3 million, with about 15 miles of trail in all.

The path is the backbone of the park, linking Huston Wyeth Park with River Bluff Trails Park by a bicycle and pedestrian bridge over Highland Avenue and giving access to hubs of the park's natural-surface singletrack and its beginner flow zone. It passes old park structures built in the 1930s and an explosives storage bunker from the time an underground quarry operated there. OpenStreetMap shows trailheads with restrooms at the south end, at West Highland Avenue and at the north end, where there is parking. The line on this page is about 2 miles.

The trail is open to pedestrians and bicycles. It is forested nearly all the way except the hilltop at Huston Wyeth Park, and despite the easy surface it has several steep climbs and descents; benches stand along its length. MTB Project notes that it is not ADA accessible but suits adaptive mountain bikes and bicycles with narrow tires.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

72% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
St Joseph Rosecrans Airport, 4.9 km from the trail's middle, 55 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374355667685888680685341
Low °F172132425464676454433121
Precipitation, in0.70.92.13.74.94.84.73.83.22.81.91.2
Old maps

USGS topographic maps of the trail's middle go back to the 1924 St. Joseph sheet (1:62,500); the 1954 Kansas City sheet (1:250,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. St. Joseph City Council approves plan & funding for major river bluff mountain bike are and hiking trails — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026
    Supports: Riverfront master plan; City Council approval of a project of more than $1.5 million (May 2021) for mountain-bike and hiking trails on the river bluff; hard-surface crushed-limestone path at the top of the bluffs open to walkers, hikers, trail runners and others
  3. River Bluff Trails Park Opens in St. Joseph, Missouri — Terrain Magazine · web · checked Oct 15, 2026
    Supports: ribbon cutting Memorial Day weekend 2022; about 15 miles of trail; hard-surface/crushed-limestone path along the top of the bluff; $3 million project; bridge over Highland Avenue linking to Huston Wyeth Park; City Council funding of the Riverfront Master Plan
  4. Crushed Limestone Trail Mountain Bike Trail, Saint Joseph, Missouri — MTB Project · web · checked Oct 15, 2026
    Supports: name; backbone of the park with hubs for natural-surface trails; wide crushed limestone trail open to pedestrians and bicycles; connects Huston Wyeth Park via bridge over Highland Avenue; forested except hilltop; steep sections; benches; 1930s park structures; quarry explosives bunker; access to beginner flow zone; not ADA accessible but suited to adaptive bikes and narrow tires
  5. River Bluff Trails North Trailhead (node 13256871135) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trailheads at south end, West Highland Avenue and north end; restrooms; parking at north trailhead

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.