States › California

Culver Boulevard Bike Path

Rail-trail in California · OpenStreetMap relation

Runs through Culver City and Los Angeles · Los Angeles County

Conditions now

Loading the weather near Los Angeles…

Forecast by the National Weather Service for Los Angeles · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Culver Boulevard mile 0 directions to trailhead 1
  2. Parking at Sepulveda Boulevard mile 0.4 directions to trailhead 2
  3. Parking at Culver Boulevard mile 0.5 directions to trailhead 3
  4. Parking at Sepulveda Boulevard mile 0.5 directions to trailhead 4
  5. Parking at South Slauson Avenue mile 0.9 directions to trailhead 5
  6. Parking at South Slauson Avenue mile 1 directions to trailhead 6
Culver Boulevard Bike Path (opens in a new tab)
Photo: mark.hogan · CC BY-SA · Flickr

About this trail

The Culver Boulevard Bike Path, also called the Culver Boulevard Median Bike Path, is a 2.1-mile Class I bike path, walking route and linear park in the median of Culver Boulevard in western Los Angeles County, California. It runs from Elenda Street in Culver City southwest to McConnell Avenue in the Del Rey neighborhood of Los Angeles. Culver City and the City of Los Angeles each maintain the portion within their limits.

The median is a rail-trail on the right-of-way of the Pacific Electric Redondo Beach via Playa del Rey Line, whose Red Cars carried passengers until World War II; Southern Pacific later used it for freight. Culver City bought the remaining right-of-way from Southern Pacific and landscaped it before 1985. The median became an official Class I route in 1996, when Culver City redesigned its section between Elenda and Sawtelle, and from 1997 Los Angeles improved the stretch from Sawtelle to McConnell.

The path passes under Interstate 405 and over the Sepulveda Creek channel. The bike lane is asphalt and the walking track asphalt or decomposed granite. Culver City rebuilt the half mile between Sepulveda Boulevard and Elenda Street in its Culver Boulevard Realignment and Urban Stormwater Project, finished in 2022, with resurfacing, more separation between walkers and riders, lighting, native landscaping and underground stormwater detention. At the northeast end the path meets the Elenda protected bikeway, opened in 2021; from the southwest end riders can reach the Ballona Creek Bike Path and the Marvin Braude Bike Trail.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Culver City, 0.8 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F676668717275787978767166
Low °F484851535760636462585247
Precipitation, in3.23.52.20.60.40.1000.10.60.92.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1896 Redondo sheet (1:62,500); the 1950 Venice sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14222708, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Culver Boulevard Median Bike Path — Wikipedia · organization · checked Oct 16, 2026
    Supports: Class I path and linear park, 2.1 miles, Elenda Street to McConnell Avenue in Del Rey, maintenance by Culver City and Los Angeles, Redondo Beach via Playa del Rey Line right-of-way, Red Cars until World War II, Southern Pacific freight, purchase before 1985, 1996 Class I designation, 1997 Los Angeles improvements, I-405 undercrossing, Sepulveda Creek channel, surfaces, connections to Ballona Creek and Marvin Braude paths
  3. Eyes on the Street: Culver City's Renovated Culver Blvd Bikeway — Streetsblog Los Angeles (August 2022) · press · checked Oct 16, 2026
    Supports: half-mile rebuild from Sepulveda Boulevard to Elenda Street under the Culver Boulevard Realignment and Urban Stormwater Project completed in 2022, resurfacing, more separation, lighting, native landscaping, underground stormwater detention, Elenda protected bikeway opened in 2021

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.