Darby Creek Greenway Trail
Greenway in Ohio · OpenStreetMap relation
In Madison and Franklin counties
Conditions now
Loading the weather near Lake Darby…
Forecast by the National Weather Service for Lake Darby · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.1 · restrooms directions to trailhead 1
- Parking mile 0.5 · restrooms directions to trailhead 2
- Parking at Kuhlwein Road mile 6.6 directions to trailhead 3
- Parking at Darby Creek Drive mile 8.9 directions to trailhead 4
- Parking mile 8.9 directions to trailhead 5
- Parking mile 9 directions to trailhead 6
(opens in a new tab) About this trail
The Darby Creek Greenway Trail, mapped here as the Darby Creek Trail, is a gravel trail for hiking, biking and pets in two parks of Metro Parks, the Central Ohio Park System: Prairie Oaks and Battelle Darby Creek. Metro Parks rates it easy and lists it as ADA accessible.
In Prairie Oaks, a 2,291-acre park that includes nearly 500 acres of prairie and grassland, the greenway runs 3.5 miles, winding through the Darby Bend Lakes area and crossing Big Darby Creek. In Battelle Darby Creek, a 7,358-acre park of forest, prairie and wetland, it runs 5 miles on a flat route through prairies and woods that crosses the two enclosed pastures where bison, reintroduced to the park, roam. Battelle Darby Creek also carries the paved Camp Chase Trail, the 12.5-mile west leg of the Ohio to Erie Trail.
On the map the two sections are separate pieces with no mapped trail between them. Both parks are open from 6:30 a.m. to 10 p.m. from April through September and from 6:30 a.m. to 8 p.m. from October through March.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Columbus Ohio State Univ Airport, 19.2 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 40 50 63 73 81 84 83 77 65 51 40 Low °F 21 23 31 41 51 60 64 62 54 43 34 26 Precipitation, in 2.2 1.9 3 3.5 3.9 4 3.7 3 3 2.5 2.4 2.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1923 West Columbus sheet (1:62,500); the 1955 Galloway sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Aug 2024 to May 2025
- Is there anywhere in the city to do gravel cycling? Even just a short distance? r/Columbus · May 2025 · 7 comments
- A few hours to spend. Metro Parks and dinner? r/Columbus · Aug 2024 · 6 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesPrairie Oaks — Metro Parks
- Agency noticesBattelle Darby Creek — Metro Parks
- RedditSearch Reddit: r/Ohio
Nearby trails
- Darby Creek Greenway Trail (Darby Bend Lakes) within 0.2 mi · 1.7 mi, crushed stone
- Camp Chase Trail 0.7 mi away · 15.3 mi, paved
- Hoffman Farms West Cycle Path 4.7 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5560056, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Prairie Oaks — Metro Parks - Central Ohio Park System · web · checked Oct 14, 2026 Supports: Darby Creek Greenway Trail name; 3.5 miles; easy; hike, bike, pets; gravel; ADA; winds through the Darby Bend Lakes area and crosses Big Darby Creek; 2,291 acres with nearly 500 acres of prairie and grassland; hours
- Battelle Darby Creek — Metro Parks - Central Ohio Park System · web · checked Oct 14, 2026 Supports: Darby Creek Greenway 5 miles; easy; hike, bike, pets; gravel; ADA; flat trail through prairies and woods that intersects the two bison pastures; bison reintroduced, in two enclosed pastures; 7,358 acres; Camp Chase Trail 12.5 miles paved, west leg of the Ohio to Erie Trail; hours
- Darby Creek Trail (relation 5560056) — OpenStreetMap · web · checked Oct 14, 2026 Supports: two separate mapped sections
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.