States › Missouri

Deer Creek Greenway

Greenway in Missouri · OpenStreetMap relation

Runs through Brentwood, Webster Groves and Maplewood · St. Louis County

Conditions now

Loading the weather near Brentwood…

Forecast by the National Weather Service for Brentwood · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Brentwood Park Public Parking mile 1.1 · restrooms directions to Brentwood Park Public Parking
  2. Parking at Owen Ridge Lane mile 1.5 directions to trailhead 2
  3. Deer Creek Park mile 2.3 directions to Deer Creek Park
  4. Parking at Edgebrook Drive mile 2.5 · water directions to trailhead 4
  5. Deer Creek Park mile 2.6 · water directions to Deer Creek Park
  6. Parking at Oxford Boulevard mile 3 directions to trailhead 6
Maplewood, along the trail (opens in a new tab)
Maplewood, along the trail · Photo: Chris Yunker · CC BY-SA 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Deer Creek Greenway is a paved asphalt greenway that follows Deer Creek through Maplewood, Webster Groves and Brentwood, Missouri. It is one of the Great Rivers Greenway greenways, which are managed in cooperation with the cities and park departments along them: Maplewood manages the stretch from Big Bend Boulevard to the bridge over Deer Creek in Deer Creek Park, Webster Groves the part from that bridge to Lorraine Davis Park, and Brentwood its own Brentwood Park.

The open section runs 3.57 miles from Deer Creek Shopping Center at Big Bend through Deer Creek Park, known as Rocket Park for its space-themed playground, to Lorraine Davis Park in Webster Groves and Brentwood Park, linking five parks. Lorraine Davis Park has boardwalks and a pavilion over the meeting of Deer and Shady creeks, and Barnickel Park has a basketball half-court. A trailhead on Marshall Avenue east of Brentwood Boulevard, built with the City of Webster Groves and the Bellwether Foundation, has parking, a pavilion, a drinking fountain, a bike repair station and a pump track. Brentwood Park, created by the Brentwood Bound flood-control project to restore the creek's floodplain, has a 2.7-acre playground, and an underpass beneath Manchester Road leads to Brentwood's community trails and toward the Maplewood MetroLink station.

Two extensions are under way. To the east, a 1-mile extension from Big Bend Boulevard through Maplewood to the River des Peres Greenway at Canterbury and Ellendale avenues in St. Louis received $3 million in federal Congestion Mitigation and Air Quality funds; construction is beginning in 2026, and a related Maplewood street rebuilding that includes a section of the greenway is expected to finish by the end of 2026, along with Oxford Bend Park at Big Bend and Oxford. To the west, an alignment study is weighing three routes through Rock Hill to Tilles Park in Ladue, with open houses held in February and June 2026.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cahokia, 13.7 km from the trail's middle, 27 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414656687685888780705645
Low °F222635455665696759463527
Precipitation, in2.72.33.54.64.84.353.13.433.32.8
Snow, in4.93.71.20.30000000.82.9
Old maps

USGS topographic maps of the trail's middle go back to the 1933 Jefferson Barracks sheet (1:24,000); the 1954 Webster Groves sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18236408, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Deer Creek Greenway: Deer Creek Park to Brentwood Park — Great Rivers Greenway · organization · checked Oct 15, 2026
    Supports: paved asphalt trail 3.57 miles from Deer Creek Shopping Center at Big Bend through Deer Creek Park in Webster Groves and Maplewood to Lorraine Davis Park and Brentwood Park; links five parks; Rocket Park and space-themed playground; Lorraine Davis Park boardwalks and pavilion overlooking the confluence of Deer and Shady creeks; Barnickel Park half-court; Marshall Avenue trailhead east of Brentwood Blvd with parking, pavilion, drinking fountain, bike fix-it station and pump track, funded with the City of Webster Groves and the Bellwether Foundation; Brentwood Park 2.7-acre playground, created as part of Brentwood Bound to restore the Deer Creek floodplain; underpass beneath Manchester Road to Brentwood community trails and toward the Maplewood MetroLink station; management by Maplewood, Webster Groves and Brentwood; each greenway managed in cooperation with municipalities and parks departments
  3. Deer Creek Greenway: Deer Creek Center to River des Peres Greenway — Great Rivers Greenway · organization · checked Oct 15, 2026
    Supports: extension from Big Bend Blvd to the River des Peres Greenway at Ellendale and Canterbury in St. Louis; $3 million federal CMAQ funds (2022 round); greenway construction beginning in 2026; Maplewood roadway reconstruction including a section of greenway, estimated complete by end of 2026; Oxford Bend Park at Big Bend and Oxford, completion by end of 2026
  4. Brickline and Deer Creek Greenways awarded a total of $7 million in Federal Construction Funds! — Great Rivers Greenway · organization · checked Oct 15, 2026
    Supports: 1-mile extension from Big Bend Blvd to the River des Peres Greenway
  5. Deer Creek Greenway: Brentwood to Tilles Park — Great Rivers Greenway · organization · checked Oct 15, 2026
    Supports: alignment study for a westward extension through Rock Hill to Tilles Park in Ladue; open houses in February and June 2026; three alignments still being evaluated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.