Delaware River Trail
Greenway in Pennsylvania · OpenStreetMap relation
Runs through Philadelphia · Philadelphia County
Conditions now
Loading the weather near Philadelphia…
Forecast by the National Weather Service for Philadelphia · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Beach Street mile 9.1 directions to trailhead 1
- Parking at North Delaware Avenue mile 9.1 directions to trailhead 2
- Rivers Casino Philadelphia Parking Lot mile 9.4 directions to Rivers Casino Philadelphia Parking Lot
- Rivers Casino Philadelphia Parking Lot mile 9.5 directions to Rivers Casino Philadelphia Parking Lot
- Rivers Casino Philadelphia Parking Lot mile 9.6 directions to Rivers Casino Philadelphia Parking Lot
- Rivers Casino Philadelphia Parking Lot mile 9.6 directions to Rivers Casino Philadelphia Parking Lot
- Parking at Penn Street mile 9.7 directions to trailhead 7
- Parking at North Beach Street mile 9.8 directions to trailhead 8
- Pier 24 Parking Lot mile 10 directions to Pier 24 Parking Lot
- Parking at Vine Street mile 10.2 directions to trailhead 10
- Parking at North Christopher Columbus Boulevard mile 10.3 · restrooms · water directions to trailhead 11
- SP+ mile 10.4 · restrooms · water directions to SP+
- Parking at South Christopher Columbus Boulevard mile 10.6 directions to trailhead 13
- Parking at South Christopher Columbus Boulevard mile 10.6 directions to trailhead 14
- Waterfront Parking mile 10.7 directions to Waterfront Parking
- Parking at South Christopher Columbus Boulevard mile 11.2 directions to trailhead 16
- Parking at Catharine Street mile 11.5 directions to trailhead 17
- Parking at Pier Road mile 11.6 directions to trailhead 18
- Parking at South Christopher Columbus Boulevard mile 11.7 directions to trailhead 19
- Parking at South Christopher Columbus Boulevard mile 11.7 directions to trailhead 20
- Parking at South Christopher Columbus Boulevard mile 11.7 directions to trailhead 21
- Parking at South Christopher Columbus Boulevard mile 11.8 directions to trailhead 22
- Delaware River Trail Trailhead mile 12.3 directions to Delaware River Trail Trailhead
(opens in a new tab) About this trail
The Delaware River Trail is a 3.3-mile waterfront trail in Philadelphia, Pennsylvania, running along Columbus Boulevard from Pier 70 in South Philadelphia to Penn Treaty Park in Fishtown. The Delaware River Waterfront Corporation (DRWC), a nonprofit, built and manages it. It is a greenway, not a rail-trail, and is part of the East Coast Greenway and the Circuit Trails network. 4.9 miles are mapped here, including short pieces farther up the river in Northeast Philadelphia.
The first section, 1.3 miles from near Pier 70 to Lombard Circle, was a joint project of DRWC and the Center City District and opened on May 27, 2010. A city-funded $20 million rebuild began in summer 2020; the stretch from Washington Avenue to Spring Garden Street was largely finished in spring 2022, and DRWC dates the trail's official completion to April 2022. Interim segments run between Tasker Street and Washington Avenue. At Spring Garden Street the trail meets the route of a planned greenway between the Delaware and Schuylkill rivers, and DRWC is seeking funding to extend the trail north to Allegheny Avenue and south to Oregon Avenue. The Washington Avenue Connector, a $9.5 million project of the Streets Department and DRWC, adds a multi-use path from Fourth Street to Columbus Boulevard linking Queen Village, Pennsport and Bella Vista with the trail; it was expected to be largely complete by the end of August 2026.
Two miles of the trail are a curb-separated, two-way asphalt bike path beside a separate sidewalk for walking and running, with landscaped planting beds between the modes. The rebuild added solar benches along the route. The trail is open year-round, seven days a week.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Phila Franklin Inst, 3.5 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 42 45 54 66 76 85 89 87 80 68 56 46 Low °F 28 30 36 46 56 66 71 70 63 51 41 33 Precipitation, in 3.6 3.3 4.5 4 4.1 4.8 4.8 5 4.9 4.2 3.4 4.3 Snow, in 6.4 4 2 0.1 0 0 0 0 0 0 0.1 3.5 - On the National Register
- Delaware Station of the Philadelphia Electric Company, The, Philadelphia · building, listed 2016
- USS BECUNA (SS-319), Philadelphia · structure, listed 1978 · nomination file for USS BECUNA (SS-319)
- BARNEGAT (lightship), Philadelphia · structure, listed 1979 · nomination file for BARNEGAT (lightship)
- U.S.S. OLYMPIA, Philadelphia · structure, listed 1966 · nomination file for U.S.S. OLYMPIA
- Southwark District, Philadelphia · historic district, listed 1972 · nomination file for Southwark District
- Old maps
USGS topographic maps of the trail's middle go back to the 1891 Philadelphia sheet (1:62,500); the 1949 Philadelphia sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Trail users posting in October 2026 said fast e-bikes shared the path, including at the crosswalks near Sprouts and Rivermark, and one pedestrian said they kept looking around for them. r/philly, Oct 2026
- Posters in October 2026 said some joggers ran in the bike lane and some cyclists rode on the paths meant for walkers and runners. r/philly, Oct 2026
- One walker posting in October 2026 said a large dumpster sat on the bike path by a restaurant and made passing slower. r/philly, Oct 2026
2 Reddit threads about this trail, Oct 2026 to Nov 2026
- Lunatics on DRT r/philly · Oct 2026 · 31 comments
- Out of town visiting biking from KOP to tourist/l historic spots sight seeing r/phillycycling · Nov 2026 · 11 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationDelaware River Trail — Delaware River Waterfront Corporation
Nearby trails
- East Coast Greenway K&T Section within 0.2 mi · 1.7 mi, paved
- Baxter Trail within 0.2 mi · 1.8 mi, paved
- Pennypack Trail 0.6 mi away · 16.8 mi, paved
- East Coast Greenway 0.8 mi away · 1.8 mi, paved
- Rancocas Creek Greenway Trail 1.0 mi away · 2.9 mi, paved · New Jersey
- Delaware River Heritage Trail 1.2 mi away · 8.7 mi, paved · New Jersey
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9646118, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- First section of waterfront trail is officially open — WHYY (PlanPhilly), May 2010 · organization · checked Oct 14, 2026 Supports: first section of 1.3 miles from near Pier 70 to Lombard Circle, joint DRWC and Center City District project, opened May 27, 2010
- Washington Avenue Connector, part of long-term plan for Delaware River waterfront, nears completion — PhillyVoice, July 27, 2026 · press · checked Oct 14, 2026 Supports: DRWC a nonprofit, trail along Columbus Boulevard from Pier 70 to Penn Treaty Park, Washington Avenue Connector $9.5 million Streets Department and DRWC project from Fourth Street to Columbus Boulevard, multi-use path, links Queen Village, Pennsport and Bella Vista, expected largely complete by end of August 2026
- Delaware River Trail — Delaware River Waterfront Corporation · web · checked Oct 14, 2026 Supports: 3.3 miles from Pier 70 to Penn Treaty Park, interim segments Tasker Street to Washington Avenue, two miles of curb-separated bi-directional asphalt bike path with separate sidewalk and planting beds, Washington Avenue to Spring Garden completed spring 2022, officially completed April 2022, managed by DRWC, East Coast Greenway and Circuit Trails, planned Spring Garden greenway, funding sought to Allegheny Avenue and Oregon Avenue, open year-round
- Multi-million dollar Delaware River Trail rehab project nearing completion — 6abc Philadelphia, October 19, 2021 · web · checked Oct 14, 2026 Supports: city spending $20 million, construction began summer 2020, Spring Garden Street to Washington Avenue stretch, protected two-way bike lanes and separate sidewalk, solar benches
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.