Delyte W. Morris Trail
Rail-trail in Illinois · OpenStreetMap relation
Runs through Edwardsville · Madison County
Conditions now
Loading the weather near Edwardsville…
Forecast by the National Weather Service for Edwardsville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Southern Illinois University at Edwardsville.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.5 directions to trailhead 1
- Parking A mile 0.7 directions to Parking A
- Parking at Circle Drive mile 0.7 directions to trailhead 3
- P-11 mile 0.9 directions to P-11
- Parking at Circle Drive mile 0.9 directions to trailhead 5
- Parking at Arboretum Lane mile 1.1 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Delyte W. Morris Trail is a paved bike and pedestrian trail of about 2.4 miles on the campus of Southern Illinois University Edwardsville (SIUE) in Edwardsville, Illinois. It lies entirely on university land and is named, according to TrailLink, for the Southern Illinois University president of the 1960s who helped create the Edwardsville campus. TrailLink classes it as a rail-trail, and OpenStreetMap maps most of it on an abandoned railroad grade; no university source describing the railroad was found.
TrailLink gives the endpoints as Stadium Drive and New Poag Road. The trail serves campus facilities and housing on the north side of the university. Its west end meets the MCT Bluff Trail of the Madison County Transit trail network, which leads to the university athletic fields, and public parking is about 300 feet from that end, off the Bluff Trail. Much of the route runs through heavy woods, often between embankments, and the mapped trail passes through several underpasses and over a bridge.
In April 2021 the SIU Board of Trustees approved a permanent easement for MCT to build a trail and bridge extending the Delyte Morris Bikeway from its northern end to the MCT Goshen Trail, with MCT responsible for construction and long-term maintenance. The MCT Yellowhammer Connector, a 2,400-foot asphalt path with a 200-foot bridge, opened with a ribbon-cutting on October 29, 2024. SIUE granted an access easement and donated 4.86 acres to MCT; the project, first envisioned in 2003, was funded through the state's Rebuild Illinois Capital Plan.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
41% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April, June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Alton - Melvin Price L&D, 15.4 km from the trail's middle, 40 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 44 54 66 75 84 87 86 80 68 54 44 Low °F 22 25 35 45 56 66 69 67 60 48 36 27 Precipitation, in 2.5 2.5 3.5 4.9 5.5 3.4 4 3.3 3.4 2.9 3.4 2.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1927 Edwardsville sheet (1:62,500); the 1954 Edwardsville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Bluff Trail within 0.2 mi · 2.6 mi, paved
- MCT Goshen Trail 0.4 mi away · 19.0 mi, paved
- MCT Watershed Trail 0.6 mi away · 1.4 mi, paved
- MCT Nature Trail 0.8 mi away · 9.3 mi, paved
- MCT Nickel Plate Trail 1.7 mi away · 27.9 mi, paved
- MCT Quercus Grove Trail 2.1 mi away · 17.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1745358, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- SIU Trustees Approve MCT Easement for Trail at SIUE — SIUE News (April 30, 2021) · organization · checked Oct 15, 2026 Supports: April 2021 permanent easement; extension of the Delyte Morris Bikeway from its northern terminus to the MCT Goshen Trail; MCT responsible for construction and long-term maintenance
- Opening of Bike Trail Offers Scenic New Entrance to SIUE Campus — SIUE News (October 29, 2024) · organization · checked Oct 15, 2026 Supports: October 29, 2024 ribbon-cutting; 2,400 feet from MCT Goshen Trail to the SIUE Delyte W. Morris Trail; 200-foot bridge; SIUE easement and 4.86-acre donation; envisioned 2003; Rebuild Illinois Capital Plan funding
- MCT Yellowhammer Connector — MCT Trails (Madison County Transit) · organization · checked Oct 15, 2026 Supports: connector links SIUE's Delyte Morris Trail to the MCT Goshen Trail; 2,400 feet, asphalt
- Delyte W. Morris Trail | Illinois Trails | TrailLink · web · checked Oct 15, 2026 Supports: 2.4 miles, asphalt, rail-trail category; endpoints Stadium Drive and New Poag Road; entirely on campus; naming; campus facilities and housing on the north side; west end meets MCT Bluff Trail toward athletic fields; parking 300 feet from west end; heavy woods and embankments
- Delyte W. Morris Trail — OpenStreetMap relation 1745358 · web · checked Oct 15, 2026 Supports: operator SIUE; asphalt; mapped on an abandoned railroad grade; underpasses and a bridge
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.