States › Minnesota

Dinkytown Greenway

Rail-trail in Minnesota · OpenStreetMap relation

Runs through Minneapolis · Hennepin County

Conditions now

Loading the weather near Minneapolis…

Forecast by the National Weather Service for Minneapolis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.8 km1
On former railbed
0.3 mi 20%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southeast 25th Avenue mile 0 directions to trailhead 1
  2. Ski-U-Mah Lot mile 0.1 directions to Ski-U-Mah Lot
  3. Victory Lot mile 0.1 directions to Victory Lot
  4. Gold Lot mile 0.2 directions to Gold Lot
  5. Parking at Southeast 6th Street mile 0.2 directions to trailhead 5
  6. Northstar Lot mile 0.3 directions to Northstar Lot
  7. Parking at Southeast 6th Street mile 0.3 directions to trailhead 7
  8. Parking at Southeast 6th Street mile 0.3 directions to trailhead 8
  9. Maroon Lot mile 0.4 directions to Maroon Lot
  10. Parking at Southeast 5th Street mile 0.5 directions to trailhead 10
  11. Parking at Southeast 5th Street mile 0.5 directions to trailhead 11
  12. Parking at Southeast 5th Street mile 0.6 · water directions to trailhead 12
  13. Parking at Southeast 5th Street mile 0.7 directions to trailhead 13
  14. Parking at Southeast 5th Street mile 0.8 directions to trailhead 14
  15. Parking at Southeast 5th Street mile 0.8 directions to trailhead 15
  16. Parking at Southeast 5th Street mile 0.8 directions to trailhead 16
  17. Parking at 4th Street Southeast mile 0.8 directions to trailhead 17
  18. Parking at 4th Street Southeast mile 0.9 directions to trailhead 18
  19. Parking at Southeast University Avenue mile 0.9 directions to trailhead 19
  20. Parking at Southeast 16th Avenue mile 0.9 directions to trailhead 20
  21. Parking at Southeast 16th Avenue mile 0.9 directions to trailhead 21
  22. Parking at Southeast 5th Street mile 0.9 directions to trailhead 22
  23. Parking at Southeast 16th Avenue mile 0.9 directions to trailhead 23
  24. Parking at Southeast University Avenue mile 1 · restrooms directions to trailhead 24
  25. Parking at Southeast 13th Avenue mile 1 · restrooms directions to trailhead 25
  26. Parking at 4th Street Southeast mile 1 · restrooms directions to trailhead 26
  27. Parking at Southeast University Avenue mile 1 · restrooms directions to trailhead 27
  28. Parking at Southeast Pillsbury Drive mile 1.1 directions to trailhead 28
  29. Parking at South 1st Street mile 1.5 directions to trailhead 29
  30. Parking at 20th Avenue South mile 1.5 directions to trailhead 30
  31. Parking at South 13th Avenue mile 1.7 directions to trailhead 31

Plan your visit

Links checked Oct 18, 2026. Sources: National Park Service boundaries.

Dinkytown Greenway (opens in a new tab)
Photo: roadgeek_md99 · CC BY-SA 4.0 · Mapillary

About this trail

The Dinkytown Greenway is a paved bicycle and pedestrian trail in Minneapolis, Minnesota, about 1 mile long, that links the University of Minnesota's East Bank campus with the Mississippi River. It runs from near the university's football stadium through an old railroad trench beneath the Dinkytown neighborhood and connects the University transitway with downtown Minneapolis bike paths. Discussion of the route began in the 1990s, construction started in 2012, and the greenway opened to bike traffic on August 4, 2013. The City of Minneapolis and Bike Walk Twin Cities, a federal non-motorized transportation pilot program, funded it, and city leaders built it in three phases after the 2007 collapse of the I-35W bridge.

TrailLink lists the endpoints as SE Oak Street and 20th Avenue South. Heading west, the trail crosses the river on Northern Pacific Bridge No. 9, a 1924 deck truss whose railroad use ended in 1981 and which opened to bicycles and pedestrians in 1999; the city built the link from the bridge to the Dinkytown trail in 2013. The third phase, the nearly quarter-mile, $3 million Bluff Street Bicycle Trail, carries the route from the bridge under the I-35W bridge and through a tunnel to 13th Avenue South downtown; it was completed in July 2014. On the west bank the greenway joins the West River Parkway Trail. Bridge No. 9 closed on April 7, 2025, for work to extend its life by 50 years and reopened on January 16, 2026.

The surface is asphalt. In 2014 the city had allocated money for a staircase from the trench up to 15th Avenue SE and 4th Street SE, but construction had not begun, and TrailLink still describes the staircase as proposed. University vehicles may use part of the trail to reach the Donhowe Building's shipping area. Parking for the east end is in the university's Maroon Lot (2028 Sixth St. SE) and Lot 37 (1811 Fifth St. SE).

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lower St Anthony Falls, 1.1 km from the trail's middle, 19 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F222740556979838072564027
Low °F81224364958646254402715
Precipitation, in0.90.91.63.34.34.84.64.53.431.71.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1896 St. Paul sheet (1:62,500); the 1951 St. Paul West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Dinkytown Greenway (opens in a new tab)
  1. 360° view 1 of 3, photo by Themis3000
  2. 360° view 2 of 3, photo by Themis3000
  3. 360° view 3 of 3, photo by Themis3000
360° panorama · Photo: Themis3000 · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3122033, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Northern Pacific Bridge Number 9 — Wikipedia · organization · checked Oct 15, 2026
    Supports: 1924 deck truss, rail use ended 1981, opened to bicycles and pedestrians 1999, city connection to the Dinkytown trail in 2013, culvert west to downtown completed July 2014, closure April 7, 2025 to January 16, 2026 for life-extension work
  3. Dinkytown Greenway opens, connecting suburbs to downtown Minneapolis — The Minnesota Daily (August 5, 2013) · press · checked Oct 15, 2026
    Supports: opened to bike traffic August 4, runs from TCF Bank Stadium to the river through an old railroad trench beneath Dinkytown, connects the University transitway with downtown bike paths, discussion began in the 1990s, construction began 2012, planned staircase at 15th Avenue SE and 4th Street
  4. Final phase of bike-walk trail connects downtown to campus — The Minnesota Daily (June 4, 2014) · press · checked Oct 15, 2026
    Supports: Bluff Street Bicycle Trail as third and final phase, nearly quarter mile, $3 million, route from Bridge No. 9 under the 35W bridge through a tunnel to 13th Avenue South, three phases after the 2007 bridge collapse, funding by the city and Bike Walk Twin Cities, staircase funding allocated but not built
  5. Dinkytown Greenway | Minnesota Trails | TrailLink · web · checked Oct 15, 2026
    Supports: 1-mile length, endpoints SE Oak Street and 20th Avenue S., asphalt surface, joins the West River Parkway Trail, staircase still described as proposed, Maroon Lot and Lot 37 parking
  6. The Dinkytown Greenway Finally Pedals Forward — streets.mn (August 5, 2013) · web · checked Oct 15, 2026
    Supports: University vehicles allowed on the trail to reach the Donhowe Building shipping/receiving area

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.