States › Virginia

Dora Trail

Greenway in Virginia

Runs through Pulaski · Pulaski County

Conditions now

Loading the weather near Pulaski…

Forecast by the National Weather Service for Pulaski · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Dora Highway Park mile 0 · water directions to Dora Highway Park
  2. Parking at Dora Highway mile 0.1 · water directions to trailhead 2
  3. Cool Springs mile 0.8 · restrooms directions to Cool Springs
  4. Heritage Park mile 1 directions to Heritage Park
  5. Parking at Dora Highway mile 1.2 directions to trailhead 5
  6. Parking at East Main Street mile 2.1 directions to trailhead 6
Dalton Theater, beside the trail (opens in a new tab)
Dalton Theater, beside the trail · Photo: Skye Marthaler · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Dora Trail is a linear, mixed-use trail of about 2.5 miles in the Town of Pulaski, Virginia, that links downtown Pulaski and its parks with New River Trail State Park. It follows Peak Creek, a stocked trout stream. The Virginia Department of Wildlife Resources lists it as a site on the Virginia Bird and Wildlife Trail, in the Lower New River Loop of the Mountain Region, and gives the Town of Pulaski's parks office as the contact. Visit Southwest Virginia describes it as the primary bicycle route and walking trail between the New River Trail and downtown Pulaski.

The western terminus is at the Pulaski Train Station and Kiwanis Park, where there is free parking, restrooms and a bicycle shop offering sales, service and rentals. From there the trail runs east along Peak Creek past access points with free parking at Cool Springs, Heritage Park and the Pulaski Community Garden. It crosses Dora Highway, passes the town's wastewater treatment plant, and goes under Route 99 and a New River Trail trestle before joining the New River Trail near that trail's northern end. The state lists the eastern terminus as the Dora Junction trailhead of New River Trail State Park, where a parking fee is required.

According to a Hiking Project description, the trail is paved at the Pulaski end and changes to crushed stone after the Dora Highway crossing, about 0.8 mile from the start. The state lists the site as open daily from dawn to dusk, with portions occasionally closed for management work. Herons, Belted Kingfishers and several swallow species are frequently seen along the creek, and the eBird hotspot for the trail lists 64 species.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pulaski 2 E, 2.6 km from the trail's middle, 57 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434654657279838276665546
Low °F242631404957616053413226
Precipitation, in3.22.73.63.6443.83.53.22.92.53.2
Snow, in4.74.62.30.60000000.13.5
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Dublin sheet (1:125,000); the 1965 Pulaski sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Dora Trail — Virginia Bird and Wildlife Trail, Virginia Department of Wildlife Resources · government source · checked Oct 14, 2026
    Supports: 2.5-mile linear, mixed-use trail connecting downtown Pulaski and local parks to New River Trail State Park; follows Peak Creek, a stocked trout stream; Mountain Region, Lower New River Loop; western terminus Pulaski Train Station/Kiwanis Park; free-parking access points Cool Springs, Heritage Park, Pulaski Community Garden; eastern terminus Dora Junction trailhead with parking fee; dawn to dusk, periodic closures for management; birds and 64 eBird species; Town of Pulaski parks contact
  3. Dora Trail of Pulaski — Visit Southwest Virginia · organization · checked Oct 14, 2026
    Supports: primary bicycle route and walking trail connecting the New River Trail to downtown Pulaski at the Pulaski Railway Station, near the New River Trail's northern terminal; via Kiwanis Park and Heritage Park; free parking, restrooms and a bicycle shop with sales, service and rentals at the station
  4. Dora Trail — Hiking Project · web · checked Oct 14, 2026
    Supports: pavement changing to crushed stone after the Dora Highway crossing at about 0.8 mile; passes the wastewater treatment plant; passes under Highway 99 and the New River Trail trestle

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.