States › Colorado

Dry Creek Trail

Greenway in Colorado · OpenStreetMap relation

Runs through Longmont and Centennial · Boulder and Arapahoe counties

Conditions now

Loading the weather near Longmont…

Forecast by the National Weather Service for Longmont · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.7 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Colorado Boulevard directions to trailhead 1
  2. Parking at East Peakview Circle directions to trailhead 2
Dry Creek Trail drawn on the 1950 USGS topographic map of Hygiene, Colorado
Then: the 1950 USGS Hygiene sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Dry Creek Trail, which the City of Longmont also calls the Dry Creek Greenway, is a paved path along Dry Creek in Longmont, Colorado, managed by Longmont Parks, Open Space and Trails. Colorado's state trail database (COTREX) lists the greenway at 5.9 miles, mostly concrete, open to walkers, bicycles, horses and leashed dogs. The trail itself is open 24 hours a day; greenway trailheads and lands are open from an hour before sunrise to an hour after sunset.

The city describes one segment running west from Willow Farm Neighborhood Park at Fordham Street to Grandview Meadows Drive near Silver Creek High School, and a separate western segment from Blue Skies Neighborhood Park to North 75th Street; the two are to be linked through Dry Creek Community Park between Grandview Meadows Drive and Mountain Drive. This record covers about 3.4 miles in Longmont as mapped in OpenStreetMap. The same OpenStreetMap name also takes in a separate 0.3-mile path near South Colorado Boulevard in Centennial, which is not connected to the Longmont trail.

Longmont's Dry Creek Trail Extension project will carry an 8-foot concrete path from Hover Street east past Sunset Street to Frontage Road, closing the gap to the St. Vrain Greenway, with wayfinding through the Village at the Peaks and a striped bike route. The city listed construction to begin in the second quarter of 2026 and expected no trail or street closures during the work.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Longmont 2 ESE, 6 km from the trail's middle, 16 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444757637384918880665445
Low °F141726324150555446332414
Precipitation, in0.60.61.2221.81.71.91.310.80.5
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Niwot sheet (1:62,500); the 1950 Hygiene sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2629212, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Dry Creek Greenway — City of Longmont · government source · checked Oct 17, 2026
    Supports: segments and endpoints, planned link through Dry Creek Community Park, hours, manager
  3. Dry Creek Trail Extension — City of Longmont · government source · checked Oct 17, 2026
    Supports: name 'Dry Creek Trail', extension route, 8-foot concrete path, St. Vrain Greenway connection, Q2 2026 construction start, no closures expected
  4. Dry Creek Greenway — Colorado Trail Explorer (COTREX, Colorado Parks and Wildlife) · government source · checked Oct 17, 2026
    Supports: 5.9-mile length, concrete surface, manager, allowed uses
  5. Dry Creek Trail (relation 2629212) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: mapped Longmont length and the separate Centennial piece

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.