States › Arizona

East Main Canal Linear Park

Canal towpath in Arizona

Runs through Yuma · Yuma County

Conditions now

Loading the weather near Yuma…

Forecast by the National Weather Service for Yuma · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.5 mi 8.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Main Canal Road mile 4 directions to trailhead 1
  2. Parking at South 14th Avenue mile 4.3 directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Yuma, along the trail (opens in a new tab)
Yuma, along the trail · Photo: en:User:Nelro · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

East Main Canal Linear Park is a paved path along the East Main Canal in Yuma, Arizona, listed in OpenStreetMap at about 5.5 miles. The name comes from OpenStreetMap; TrailLink calls the path the East Main Canal Path.

TrailLink says the canal belongs to the Yuma Project, built in 1915 as an irrigation system, and that the path alongside it gives Yuma residents 5.9 miles of outdoor recreation. At its northern end it connects with the Yuma Crossing Bike Path, which TrailLink lists at 3.4 miles. Sights along the route include Friendship Park, Desert Hills Golf Course, Kofa High School and residential neighborhoods.

A TrailLink reviewer describes a lit path that runs from West 32nd Street to West First Street and includes an underpass at Old Highway 95, with the two busy road crossings hard to find. That is a single user's account.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Yuma Quartermaster Depot, 4.3 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F7175828897106109109104937969
Low °F454752566269767769595044
Precipitation, in0.40.30.30.10.100.30.20.10.20.20.8
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Yuma sheet (1:125,000); the 1952 Yuma West sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name and length of this record
  3. East Main Canal Path — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 17, 2026
    Supports: 1915 Yuma Project, 5.9 miles, Yuma Crossing Bike Path connection, landmarks, review

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.