Eastern Beltway Trail
Greenway in Nevada · OpenStreetMap relation
Runs through Paradise · Clark County
Conditions now
Loading the weather near Paradise…
Forecast by the National Weather Service for Paradise · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Windmill Lane mile 1.1 directions to trailhead 1
- Parking mile 2.6 directions to trailhead 2
- Parking at South Eastern Avenue mile 3 directions to trailhead 3
- Parking at Euclid Street mile 3.1 directions to trailhead 4
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Eastern Beltway Trail is a paved multi-use path alongside the I-215 Beltway on the southeast side of the Las Vegas Valley in Nevada. Clark County lists it among its completed trail projects as the I-215 East Beltway Trail, extending almost 4 miles along the west side of the I-215 Beltway between Warm Springs Road and Pecos Road, as part of the Las Vegas Valley Primary Trail System and as a continuation of the trail along I-215 in the City of Henderson. The county adds that the trail offers recreation and an alternative route for some employees who bike to work.
The trail follows the freeway corridor rather than a railroad or canal. A trail guide on Wizard of Vegas describes a 4.1-mile route running from Warm Springs Road and Paradise Road at the northwest end to Saint Rose Parkway at the southeast end, with many street crossings, including an at-grade crosswalk at Eastern Avenue, a turn at Windmill Lane and Maryland Parkway, and a bridge over Duck Creek. The two descriptions differ on which side of the freeway the path lies and on its exact endpoints.
Further south, in Henderson, the path is the I-215 Trail. The Henderson 215 Project site reports long-term closures of the trail between Valle Verde Drive and Saint Rose Parkway, and between Arroyo Grande Boulevard and Stephanie Street, for construction, with detours to Paseo Verde Parkway (update of October 15, 2026). A September 2026 report by 8 News Now says the trail running from Henderson ends at Paradise Road, which leaves cyclists on Warm Springs Road to reach the Western Beltway Trail at Tropicana Avenue.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Las Vegas Mccarran Airport, 5.1 km from the trail's middle, 9 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 58 63 71 78 88 99 104 103 95 81 67 57 Low °F 40 44 50 57 66 76 82 81 72 60 47 40 Precipitation, in 0.6 0.8 0.4 0.2 0.1 0 0.4 0.3 0.3 0.3 0.3 0.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Las Vegas sheet (1:250,000); the 1967 Las Vegas SW sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Oct 2026
- Should I bring the road or gravel bike to Vegas r/cycling · Oct 2026 · 26 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Nearby trails
- Saint Rose Parkway Trail within 0.2 mi · 9.0 mi, paved
- Southern Beltway Trail within 0.2 mi · 5.1 mi, paved
- Pittman Wash Trail within 0.2 mi · 5.5 mi, paved
- Paseo Verde Trail 0.3 mi away · 2.1 mi, paved
- Amargosa Trail 0.6 mi away · 10.2 mi, paved
- Sunridge Trail 1.8 mi away · 2.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13673191, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Completed Trail Projects — Clark County, NV · government source · checked Oct 17, 2026 Supports: I-215 East Beltway Trail, almost 4 miles, west side of the beltway between Warm Springs and Pecos, part of Las Vegas Valley Primary Trail System, continuation of Henderson trail, commuting use
- North Las Vegas expansion of 215 Beltway trail opens new ways for cyclists to avoid streets — 8 News Now · press · checked Oct 17, 2026 Supports: Eastern Beltway Trail from Henderson ends at Paradise Road; cyclists use Warm Springs Road
- CoH Henderson 215 Project — official project site (managed by a third party for the City of Henderson) · web · checked Oct 17, 2026 Supports: long-term closures of the I-215 Trail in Henderson and detour to Paseo Verde Parkway, update of 10.15.26
- East Beltway Trail — Wizard of Vegas · web · checked Oct 17, 2026 Supports: 4.1-mile route, termini, Eastern Avenue crosswalk, Windmill Lane turn, Duck Creek bridge, street crossings
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.