States › Maine

Eastern Prom Multi-Use Trail

Rail-trail in Maine · OpenStreetMap relation

Runs through Portland · Cumberland County

Conditions now

Loading the weather near Portland…

Forecast by the National Weather Service for Portland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 2.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Cutter Street mile 0.7 · water directions to trailhead 1
  2. Parking at Cutter Street mile 0.8 · restrooms directions to trailhead 2
  3. Parking at Cutter Street mile 0.8 · restrooms directions to trailhead 3
  4. Parking at Cutter Street mile 0.8 · restrooms directions to trailhead 4
  5. Parking at Cutter Street mile 0.8 · restrooms directions to trailhead 5
  6. Parking at Fort Allen Park mile 1.2 directions to trailhead 6
  7. Parking at Eastern Promenade mile 1.3 directions to trailhead 7
  8. Parking at Fore Street mile 1.4 directions to trailhead 8
  9. City of Portland Day Parking Lot mile 1.6 directions to City of Portland Day Parking Lot
  10. Parking at Thames Street mile 1.6 · water directions to trailhead 10
  11. Parking at Hancock Street mile 1.6 directions to trailhead 11
  12. Ocean Gateway Lot mile 1.7 directions to Ocean Gateway Lot
  13. Parking at Fore Street mile 1.8 directions to trailhead 13
  14. Parking at Commercial Street mile 1.8 directions to trailhead 14
  15. Parking at India Street mile 1.8 directions to trailhead 15
  16. Parking at Fore Street mile 1.8 directions to trailhead 16
  17. Parking at Fore Street mile 1.8 directions to trailhead 17
Maine Narrow Gauge Railroad tracks along the Eastern Promenade, October 2011 (opens in a new tab)
Maine Narrow Gauge Railroad tracks along the Eastern Promenade, October 2011 · Photo: BathyMetrix at English Wikipedia · CC BY 3.0 · Wikimedia Commons

About this trail

The Eastern Promenade Trail is a paved waterfront path in Portland, Maine, running along the shore below the Eastern Promenade, a 68.2-acre public park that rings the Munjoy Hill neighborhood. Wikipedia gives the trail's length as 2.1 miles; about 1.8 miles are mapped here. Portland Trails, a nonprofit urban land trust, manages it. It is part of the East Coast Greenway.

The trail occupies former Canadian National Railroad property below the park, part of the rail yard built when Portland served as Canada's winter port; grain arrived there by freight train and European immigrants were processed and sent west until Canada developed its own Atlantic ports after World War II. The yard then sat idle for decades. The city acquired the property around 1993 with help from Portland Trails. The first section, from India Street to East End Beach, opened in 1997, and the section from the beach to Back Cove followed in 1998. The Maine Narrow Gauge Railroad, a tourist line, shares the right-of-way.

The trail connects with the Back Cove Trail and the Bayside Trail at its northern end, and connector trails climb the slope to Fort Allen Park and the Loring Memorial; a parallel stone-dust Mid-Slope Trail loops back to East End Beach. Trailheads are on Commercial Street, with on-street parking, at East End Beach, with public lots off Cutter Street, and at Marginal Way. There is no fee and pets are permitted.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 83% of this route as an out-of-service rail line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Portland International Jetport, 5.1 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323542546474807971604838
Low °F161726354655616052413222
Precipitation, in3.53.54.14.43.74.23.43.63.85.24.24.5
Snow, in18.616.613.62.8000000.22.314.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Casco Bay sheet (1:62,500); the 1956 Portland East sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 104927, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Eastern Promenade — Wikipedia · organization · checked Oct 13, 2026
    Supports: 68.2-acre park; rings Munjoy Hill; paved trail 2.1 miles; popular with bicyclists; Maine Narrow Gauge Railroad
  3. Our View: Eastern Prom Trail marks a milestone — Portland Press Herald (August 26, 2013) · press · checked Oct 13, 2026
    Supports: former Canadian National rail yard and its history; idle for decades; city acquisition about 20 years before 2013 with help from Portland Trails, a nonprofit urban land trust; 1997 and 1998 openings; Maine Narrow Gauge Railroad shares the right-of-way
  4. Eastern Promenade Trail — Maine Trail Finder · web · checked Oct 13, 2026
    Supports: Portland Trails as manager; East Coast Greenway; connections; Mid-Slope Trail; trailheads and parking; no fee; pets
  5. Eastern Promenade Trail — TrailLink · web · checked Oct 13, 2026
    Supports: 2.1 miles; Bayside and Back Cove connections at the northern end

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.