Eastern Regional Greenway
Greenway in Georgia · OpenStreetMap relation
In Gwinnett and Barrow counties
Conditions now
Loading the weather near Auburn…
Forecast by the National Weather Service for Auburn · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Eastern Regional Greenway is a trail along the Apalachee River in eastern Gwinnett County, Georgia, built by the county as part of its Eastern Regional Infrastructure project, which also laid water lines and gravity sewers and built the Apalachee Pump Station. County leaders broke ground on the project in November 2021; the Board of Commissioners had awarded the $125 million design-and-construction contract to JDS Inc., and the county's 2017 SPLOST revenue was set aside for the trails, about $19.5 million of the total.
The county cut the ribbon on the Eastern Regional Greenway Trailhead and the pump station in August 2024. The trailhead, on Harbins Road, gives access to 5.25 miles of trail along the river. At the opening a little over 2 miles, from Harbins Road to Highway 316, was open to the public, with the rest to follow as construction finished. The trailhead has parking, restrooms, a pavilion, seating, a grassy play area and a bioretention area. This record maps about 5.1 miles of paved path in two pieces.
The county has described the greenway as a link toward trail systems heading east into Barrow County and beyond, and toward the planned Piedmont Pathway to the southwest, which would reach trail networks across metro Atlanta.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, April to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Winder 4s, 11.7 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 58 66 74 80 87 89 89 83 74 64 55 Low °F 32 35 40 47 56 64 68 67 62 51 41 35 Precipitation, in 5 4.4 5.2 4.3 4.2 4.6 4.1 4.9 4.3 3.4 4 2.5 Snow, in 0.3 0 0 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Monroe sheet (1:125,000); the 1964 Bold Springs sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Georgia
Nearby trails
- Harris Greenway Trail 3.7 mi away · 3.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20266798, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- County Leaders Break Ground on Eastern Regional Infrastructure Project — Gwinnett County · web · checked Oct 16, 2026 Supports: November 2021 groundbreaking, about five miles of new public trails, $125 million contract to JDS Inc., 2017 SPLOST funds the trails, connections toward Barrow County and the future Piedmont Pathway
- Gwinnett Co. unveils new pump station providing miles of water pipes, sewer systems, walking trails — WSB-TV · web · checked Oct 16, 2026 Supports: August 2024 ribbon cutting for the Eastern Regional Greenway Trailhead and Apalachee Pump Station, 5.25 miles of trails from Harbins Road along the Apalachee River, a little over 2 miles open from Harbins Road to Highway 316, trailhead amenities
- Gwinnett County Launches Eastern Regional Greenway Trailhead Amidst Sustainable Growth Efforts — Hoodline · web · checked Oct 16, 2026 Supports: about $19.5 million of the $125 million budget from SPLOST for the trails, water pipelines and gravity sewers in the project
- OpenStreetMap relation 20266798 — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped length about 5.1 miles of paved path in two pieces
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.