Eastern Shore Trail
Greenway in Alabama · OpenStreetMap relation
Runs through Daphne, Fairhope and Point Clear · Baldwin County
Conditions now
Loading the weather near Fairhope…
Forecast by the National Weather Service for Fairhope · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Main Street mile 0.6 directions to trailhead 1
- Parking at North Main Street mile 0.7 directions to trailhead 2
- Parking at North Main Street mile 0.7 directions to trailhead 3
- Parking at North Main Street mile 0.7 directions to trailhead 4
- Parking at US Highway 98 mile 0.7 directions to trailhead 5
- Parking at US Highway 98 mile 0.7 directions to trailhead 6
- Parking at Cheshire Lane mile 1 directions to trailhead 7
- Parking at Lincoln Street mile 1 directions to trailhead 8
- Parking at Bayline Drive mile 1 directions to trailhead 9
- Parking at Main Street mile 3.9 directions to trailhead 10
- Parking at Main Street mile 4.3 directions to trailhead 11
- Parking at College Avenue mile 4.3 directions to trailhead 12
- Parking at Dryer Avenue mile 4.3 directions to trailhead 13
- Parking at College Avenue mile 4.4 directions to trailhead 14
- Parking at Main Street mile 5.4 directions to trailhead 15
- Parking at Main Street mile 5.4 directions to trailhead 16
- Parking at Main Street mile 7.8 · water directions to trailhead 17
- Parking at Main Street mile 7.8 · water directions to trailhead 18
- Parking at Main Street mile 7.9 · water directions to trailhead 19
- Parking at Main Street mile 7.9 · water directions to trailhead 20
- Parking at North Section Street mile 9.1 directions to trailhead 21
- Parking at Fairwood Boulevard mile 9.3 directions to trailhead 22
- Parking at North Bancroft Street mile 9.8 · restrooms · water directions to trailhead 23
- Parking at Scenic Highway 98 mile 13.3 directions to trailhead 24
- Parking at Scenic Highway 98 mile 13.4 directions to trailhead 25
- Parking at Lakewood Drive mile 13.4 directions to trailhead 26
- Parking at Grand Boulevard mile 13.5 directions to trailhead 27
- Parking at Grand Boulevard mile 13.5 directions to trailhead 28
- Parking at Scenic Highway 98 mile 13.6 directions to trailhead 29
- Parking at Lakewood Drive mile 13.6 directions to trailhead 30
- Parking at Scenic Highway 98 mile 14.4 directions to trailhead 31
Plan your visit
- National Recreation TrailDesignated in 2010 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Eastern Shore Trail is a multi-use trail that roughly follows the eastern shore of Mobile Bay in Baldwin County, Alabama, from Gator Alley at Interstate 10 in Daphne south to the Weeks Bay Reserve on Scenic Highway 98. It passes through Spanish Fort, Daphne, Montrose, Fairhope and Point Clear. The trail's 2010 National Recreation Trail application describes it as a varied-surface trail for pedestrians and slow bikes, 22 miles long; in 2026 Baldwin County put the system at about 23 miles. It is not a rail-trail.
The trail was envisioned by the late Teko Wiseman, founder of the Trailblazers of Baldwin County, a group that raised money to match the grants that built it and that now advocates for walking and cycling connections. It was assembled piece by piece with support from the cities and towns along the route, and the county engineer has described it as built gradually as funding and grants became available.
The surface changes along the way: some segments are sidewalks, some are shared with the road, and others are asphalt path. The northern end, at the Gator Boardwalk in Daphne, overlooks D'Olive Creek, and many users start at Daphne's Village Point Park Preserve or at public parking in Fairhope. In February 2026 the county began building a 1.84-mile, 8-foot-wide asphalt extension along U.S. 98 beginning at Fish River, a $2 million project paid with federal funds and expected to be finished in summer 2026, which would bring the trail to about 24.8 miles; funding has been earmarked for a final phase ending in Magnolia Springs. This record maps about 23 miles.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fairhope 2 NE, 3.4 km from the trail's middle, 30 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 65 72 78 85 89 91 91 88 80 71 64 Low °F 37 40 46 52 60 68 70 69 65 54 44 39 Precipitation, in 5.5 4.7 5.1 5.5 4.9 6.8 9 7.2 6.6 4.4 4.6 5.2 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Battles Wharf Historic District, Battles Wharf · historic district, listed 1988 · nomination file for Battles Wharf Historic District
- Brodbeck--Zundel Historic District, Point Clear · historic district, listed 1988 · nomination file for Brodbeck--Zundel Historic District
- Point Clear Historic District, Point Clear · historic district, listed 1988 · nomination file for Point Clear Historic District
- Fairhope Downtown Historic District, Fairhope · historic district, listed 2006
- Fairhope Bayfront District, Fairhope · historic district, listed 1988 · nomination file for Fairhope Bayfront District
- Montrose Historic District, Montrose · historic district, listed 1976 · nomination file for Montrose Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1921 Fairhope sheet (1:62,500); the 1953 Daphne sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Alabama
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1783202, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eastern Shore Trail — National Recreation Trails database (2010 application) · organization · checked Oct 16, 2026 Supports: Gator Alley at I-10 in Daphne to Weeks Bay Reserve on Scenic Highway 98; Spanish Fort, Daphne, Montrose, Fairhope, Point Clear; varied-surface trail for pedestrians and slow bikes, 22 miles; follows the eastern shore of Mobile Bay; built with support from cities and towns; Baldwin County Trailblazers fundraising and advocacy; sidewalk, shared on-road and asphalt segments; Gator Boardwalk on D'Olive Creek; Village Point Park Preserve and Fairhope parking
- Baldwin County advances multi-use trail project along U.S. 98 — NBC 15 (February 17, 2026, Baldwin County Commission announcement) · web · checked Oct 16, 2026 Supports: construction under way on a 1.84-mile, 8-foot-wide asphalt segment beginning at Fish River; system currently about 23 miles, about 24.8 miles when complete; $2 million budget within the U.S. 98 right-of-way; federal funding; completion expected summer 2026
- Eastern Shore Trail expansion continues in Baldwin County — FOX10 News (February 19, 2026) · web · checked Oct 16, 2026 Supports: trail envisioned by the late Teko Wiseman, founder of the Trailblazers of Baldwin County, who raised grant match money; county engineer on building piece by piece as funding came available; funding earmarked for a final phase ending in Magnolia Springs
- Eastern Shore Trail (relation 1783202) — OpenStreetMap · web · checked Oct 16, 2026 Supports: extent of this record's map line, about 23 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.