Emerald Trail
Greenway in Florida · OpenStreetMap relation
Runs through Jacksonville · Duval County
Conditions now
Loading the weather near Jacksonville…
Forecast by the National Weather Service for Jacksonville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Park Street mile 0.2 directions to trailhead 1
- Parking at West Bay Street mile 0.3 directions to trailhead 2
- Parking at West Forsyth Street mile 0.4 directions to trailhead 3
- Parking at West Adams Street mile 0.5 directions to trailhead 4
- Parking at West Duval Street mile 0.6 directions to trailhead 5
- Parking at Lee Street mile 0.6 directions to trailhead 6
- Parking at Lee Street mile 0.6 directions to trailhead 7
- Parking at West Duval Street mile 0.7 directions to trailhead 8
(opens in a new tab) About this trail
The Emerald Trail is a planned trail and park system of about 30 miles in Jacksonville, Florida, meant to link 14 neighborhoods in the urban core with downtown. Groundwork Jacksonville is the City of Jacksonville's partner on the project. The mapped record is the first segment to open, the 1.3-mile LaVilla Link, which the city designed and built with Groundwork Jacksonville; ground was broken on August 24, 2021, and the link opened on May 6, 2024.
The LaVilla Link starts near Stonewall Street in Brooklyn, crosses the Park Street bridge over McCoys Creek, follows Lee Street past West Bay, Forsyth and Duval streets, and ends at the S-Line Rail Trail at State Street, giving nearly 3 miles of continuous trail. It passes a boardwalk at LaVilla Pond and a shaded overlook on the Park Street bridge.
The trail is 14 feet wide and concrete, with protected bike lanes and bicycle traffic signals at crossings. A $147 million U.S. Department of Transportation grant and $132 million from the local option gas tax are to pay for the remaining segments, which were due by 2031.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Jacksonville Nas, 11.1 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 66 69 74 80 86 90 92 91 88 82 73 68 Low °F 47 50 55 61 69 74 76 76 74 66 56 50 Precipitation, in 2.9 2.3 3.1 2.4 3.2 7.3 6 6.3 6.1 3.5 2 2.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Jacksonville Terminal Complex, Jacksonville · building, listed 1976 · nomination file for Jacksonville Terminal Complex
- Old maps
USGS topographic maps of the trail's middle go back to the 1918 Jacksonville sheet (1:62,500); the 1950 Jacksonville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationGroundwork Jacksonville
Nearby trails
- S-Line Urban Greenway within 0.2 mi · 3.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18433780, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Groundbreaking for LaVilla Link Signals Start of Emerald Trail Construction — Downtown Investment Authority, City of Jacksonville · government source · checked Oct 17, 2026 Supports: 30-mile trail linking 14 urban-core neighborhoods with downtown; LaVilla Link 1.3 miles, first of nine projects; groundbreaking August 24, 2021; Groundwork Jacksonville's role
- Community Celebrates the Opening of the LaVilla Link — Groundwork Jacksonville · organization · checked Oct 17, 2026 Supports: opening May 6, 2024; first segment of the Emerald Trail; Brooklyn to the S-Line Rail Trail through LaVilla; designed and built by the City with Groundwork Jacksonville; nearly three miles of continuous trail with the S-Line
- LaVilla Link goes green as first stretch of Emerald Trail opens — Jacksonville Today · organization · checked Oct 17, 2026 Supports: route from Stonewall Street over the Park Street bridge along Lee Street to the S-Line at State Street; LaVilla Pond boardwalk; overlook on the bridge; 14-foot concrete trail; protected bike lanes and bicycle signals; $147 million federal grant, $132 million gas tax, remaining segments by 2031
- OpenStreetMap relation 18433780 (Emerald Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: mapped route named Emerald Trail along Lee Street (concrete cycleways); street crossings at Bay, Forsyth and Duval streets
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.