States › California

Enterprise Canal Trail

Canal towpath in California

Runs through Clovis · Fresno County

Conditions now

Loading the weather near Clovis…

Forecast by the National Weather Service for Clovis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.6 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Enterprise Canal Trail (opens in a new tab)
Photo: bikebike · CC BY-SA 4.0 · Mapillary

About this trail

The Enterprise Canal Trail is a City of Clovis trail in Fresno County, California, that follows the Enterprise Canal, an irrigation canal. The city's 2007 trail guide calls it the Enterprise Trail, "a wide trail meandering along an historic agricultural irrigation canal," and counted more than 10 miles of walking and cycling trails in Clovis at the time, with more than 40 miles planned. In March 2005 the city approved the Enterprise Canal Trail and Shepherd Avenue Realignment, which called for about 2,150 feet of 10-foot-wide asphalt bike trail on the south side of Shepherd Avenue, from the Enterprise Canal bridge about 500 feet west of Sunnyside Avenue to a point about 1,300 feet east of it, with a steel bridge over Dry Creek.

In OpenStreetMap the trail begins at East Shepherd Avenue beside Big Dry Creek and runs southeast along the canal, past Nees Avenue, to Owens Mountain Parkway, where it meets the Sierra Gateway Trail; the mapped line has a short break south of Nees Avenue. Concrete paths at the Dry Creek Trailhead lead to the adjacent Dry Creek and Enterprise Canal trails. This record maps about 2.2 miles.

Caltrans District 6 and the City of Clovis plan a Class 1 bicycle and pedestrian bridge over State Route 168, east of North Temperance Avenue and south of Owens Mountain Parkway, to carry the trail south of the highway and give direct access to the Clovis Community Hospital complex. The bridge would be about 18 feet wide and 460 feet long with about 1,100 feet of approaches; Caltrans approved the project's negative declaration on December 27, 2024. No construction date was found.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fresno Yosemite International Airport, 9.8 km from the trail's middle, 18 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F556168748391989691796555
Low °F414347515864696863554540
Precipitation, in2.21.91.910.40.2000.10.60.91.8
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1923 Clovis sheet (1:31,680); the 1947 Clovis sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Enterprise Canal Trail and Shepherd Avenue Realignment (EA2004-35), Notice of Determination — CEQAnet, State of California · government source · checked Oct 16, 2026
    Supports: City of Clovis approval March 7, 2005; about 2,150 linear feet of 10-foot-wide asphalt concrete bike trail on the south side of Shepherd Avenue from the Enterprise Canal bridge about 500 feet west of Sunnyside to about 1,300 feet east of Sunnyside; steel bridge over Dry Creek; Fresno County
  3. State Route 168 Enterprise Canal Pedestrian Overcrossing Project, Notice of Determination — CEQAnet, State of California · government source · checked Oct 16, 2026
    Supports: City of Clovis with Caltrans; Class 1 overcrossing of SR 168 east of North Temperance Avenue and south of Owens Mountain Parkway; extends the Enterprise Canal Trail south of SR 168 with access to the Clovis Community Hospital complex; about 18 feet wide and 460 feet long, approaches about 1,100 feet; approved December 27, 2024
  4. Guide to the Trails of Clovis (© 2007 City of Clovis brochure, hosted by greatruns.com) · web · checked Oct 16, 2026
    Supports: Enterprise Trail described as a wide trail along an historic agricultural irrigation canal; more than 10 miles of trails, more than 40 miles planned (2007)
  5. New Year, New Adventures on the Trails — Kings River Life (January 2023) · web · checked Oct 16, 2026
    Supports: concrete paths at the Dry Creek Trailhead lead to the adjacent Dry Creek and Enterprise Canal trail systems
  6. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: route from East Shepherd Avenue at Big Dry Creek along the Enterprise canal past Nees Avenue to Owens Mountain Parkway and the Sierra Gateway Trail; break south of Nees Avenue; record length about 2.2 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.