Escanaba to Hermansville Rail Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Hermansville, Meyer Township, Spalding Township, Harris Township, Bark River Township, Ford River Township and Wells Township (Delta County) · Menominee and Delta counties
Conditions now
Loading the weather near Powers…
Forecast by the National Weather Service for Powers · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Michigan DNR Parks and Recreation Division.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Escanaba to Hermansville Rail Trail is a multi-use trail of roughly 25 miles in Michigan's Upper Peninsula, linking Hermansville in Menominee County with Escanaba in Delta County. The Michigan Department of Natural Resources (DNR) developed it on an inactive railroad corridor that the state bought from Wisconsin Central in 2007 for $550,000, a purchase by the DNR's Parks and Recreation Division and the Michigan Department of Transportation with a Michigan Natural Resources Trust Fund grant, made under the State Transportation Preservation Act. The visitor site Visit Escanaba describes the grade as the former Soo Line Railroad, built in 1901.
From 2009 through 2011 the DNR took public comment on the corridor, and most respondents asked for multiple uses, from hiking, biking and off-road vehicles to snowmobiling and horseback riding. In 2013 American Transmission Co. proposed siting an electric transmission line beside the rail-trail and in return funded construction and maintenance of the trail, including three bridge upgrades, in a $3.5 million project. Gov. Rick Snyder opened the trail on August 16, 2017, with a ribbon-cutting at the Thomas St. Onge Veterans Museum in Hermansville and an off-road vehicle ride east to the Great Lakes Sports and Recreation Club in Escanaba. The Normenco Sportsman's Club of northern Menominee County and the Sportsmen's Off-Road Vehicle Association of Delta County sponsor the trail and coordinate its maintenance.
The trail starts near the Upper Peninsula State Fairgrounds in Escanaba and ends at Main and 1st streets in Hermansville. The surface is crushed gravel and the route is heavily wooded, with overlooks on its three bridges. ATV riders and snowmobilers share the trail with walkers and bicyclists. Visit Escanaba lists it as part of the Iron Belle Trail network between Ironwood and Detroit.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cornell 5se, 18 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 27 30 41 53 66 76 82 81 72 58 44 33 Low °F 8 9 18 29 40 50 55 54 47 36 26 16 Precipitation, in 1.2 1.1 1.4 2.5 2.9 3.2 3.5 3.5 3.6 3.3 2.2 1.7 Snow, in 10.3 8.4 7.9 3.1 0.1 0 0 0 0 0.4 3.7 8.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1932 Whitney SE sheet (1:31,680); the 1963 Schaffer sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Jul 2025
- Gravel riding near Escanaba & Gladstone r/MichiganCycling · Jul 2025 · 1 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Little Bay de Noc Trail 3.6 mi away · 3.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8226770, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “managing_org from Michigan DNR Statewide Railtrails”
- Gov. Snyder rides new multi-use trail in Upper Peninsula — Michigan Department of Natural Resources (Aug. 16, 2017) · web · checked Oct 14, 2026 Supports: roughly 25 miles; Menominee and Delta counties; DNR development; 2007 purchase from Wisconsin Central for $550,000 by DNR Parks and Recreation and MDOT with Natural Resources Trust Fund grant under the State Transportation Preservation Act; 2009-2011 public comment and desired uses; 2013 American Transmission Co. proposal, construction and maintenance funding, three bridge upgrades, $3.5 million; Aug. 16, 2017 opening, ribbon-cutting at the Thomas St. Onge Veterans Museum, ride to the Great Lakes Sports and Recreation Club; Normenco Sportsman's Club and Sportsmen's Off-Road Vehicle Association as sponsors coordinating maintenance
- Showcasing the DNR: Upper Peninsula trail partners, volunteers are essential — Michigan Department of Natural Resources (Aug. 25, 2017) · web · checked Oct 14, 2026 Supports: roughly 25-mile Hermansville to Escanaba multi-use trail; $3.5 million joint trail and transmission line; corridor acquisition details; sponsor clubs
- Escanaba to Hermansville Rail Trail — Visit Escanaba · web · checked Oct 14, 2026 Supports: former Soo Line Railroad built in 1901 (attributed); crushed-gravel surface; Iron Belle Trail network; endpoints near the Upper Peninsula State Fairgrounds and at Main and 1st streets in Hermansville; heavily wooded; overlooks from three bridges; open to ATVs and snowmobiles as well as non-motorized use
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.