States › Idaho

Farragut Naval Training Station Spur or Farragut Railroad Trail

Rail-trail in Idaho

Runs through Athol · Kootenai County

Conditions now

Loading the weather near Athol…

Forecast by the National Weather Service for Athol · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.4 km1
On former railbed
3.4 mi 74%
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Roberts Road mile 0.4 directions to trailhead 1
Athol, along the trail (opens in a new tab)
Athol, along the trail · Photo: Tony Webster · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Farragut Railroad Trail is a dirt trail of about 4.6 miles in Idaho, between Athol and Farragut State Park, of which 3.4 miles follow railbed in the OpenStreetMap record. The record carries the compound name Farragut Naval Training Station Spur or Farragut Railroad Trail, from OpenStreetMap, and the trail's manager could not be confirmed.

During World War II the Navy built a training station on the site of Farragut State Park. According to Wikipedia, the Northern Pacific Railway served it by a 5 1/2-mile line connecting to the main line at Athol. The first freight train arrived on June 5, 1942, and liberty trains ran three times daily to Spokane. The pages fetched do not say whether the trail follows that line.

Idaho Parks and Recreation says Farragut State Park has more than 40 miles of trails for hiking and biking, with more than 20 miles open to horses on the north side. The park's biking page lists Farragut among the parks offering single-track mountain biking. The park page does not mention a railroad trail, so the trail's status and conditions could not be confirmed.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bayview Model Basin, 7.6 km from the trail's middle, 116 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353845546470808069544234
Low °F232328333945504942332722
Precipitation, in2.41.82.52.12.31.90.90.912.23.13.6
Snow, in8.73.21.800000001.412.1
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Rathdrum sheet (1:125,000); the 1961 Athol sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Farragut State Park — Idaho Parks and Recreation · government source · checked Oct 17, 2026
    Supports: over 40 miles of trails for hiking and biking, over 20 miles open to horses on the north side
  3. Biking — Idaho Parks and Recreation · government source · checked Oct 17, 2026
    Supports: Farragut listed among parks with single-track mountain biking
  4. Farragut Naval Training Station — Wikipedia · organization · checked Oct 17, 2026
    Supports: Northern Pacific 5 1/2-mile line to Athol, first train June 5, 1942, liberty trains to Spokane
  5. OpenStreetMap ways for this trail · web · checked Oct 17, 2026
    Supports: name, dirt surface, mapped length, railbed share

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.