States › New York

FDR Drive Greenway

Greenway in New York · OpenStreetMap relation

Runs through New York and Manhattan · New York County

Conditions now

Loading the weather near New York…

Forecast by the National Weather Service for New York · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.6 mi 5.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 106th Street mile 1.1 directions to trailhead 1
  2. Parking at FDR Drive mile 1.4 directions to trailhead 2
  3. Parking at East 99th Street mile 1.5 directions to trailhead 3
  4. Parking at FDR Drive mile 1.5 directions to trailhead 4
  5. Parking at East 73rd Street mile 2.9 directions to trailhead 5
  6. Parking at East 61st Street mile 3.5 · restrooms · water directions to trailhead 6
FDR Drive Greenway (opens in a new tab)
Photo: pkowalewska · CC BY-SA 4.0 · Mapillary

About this trail

This record maps about 3.3 miles of the East River Greenway beside the FDR Drive on Manhattan's East Side, from about East 60th Street north to the greenway's dead end at 125th Street in East Harlem. The East River Greenway, about 9.4 miles from Battery Park and part of the Manhattan Waterfront Greenway, is mostly run by NYC Parks and open to walkers and cyclists. Near 90th Street it runs along Carl Schurz Park on a deck over the FDR Drive, and the Wards Island Bridge at 103rd Street crosses to Randalls and Wards Islands. In August 2026 Parks and the Economic Development Corporation scaled back a rebuild of the crumbling East Harlem esplanade, leaving 94th to 105th streets to be patched.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
New York Laguardia Airport, 5.3 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404350617281868477665545
Low °F293036465666727164534335
Precipitation, in3.22.943.93.644.34.43.93.83.14.1
Snow, in8.69.85.40.4000000.10.35.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Harlem sheet (1:62,500); the 1956 Central Park sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: FDR Drive Greenway (opens in a new tab)
  1. 360° view 1 of 2, photo by pkowalewska
  2. 360° view 2 of 2, photo by pkowalewska
360° panorama · Photo: pkowalewska · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3005309, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. East River Greenway — Wikipedia · organization · checked Oct 14, 2026
    Supports: length about 9.44 miles from Battery Park; dead end at 125th Street; part of the Manhattan Waterfront Greenway; NYC Parks operates the largest portions; walkers and cyclists; Carl Schurz Park deck over the FDR Drive near 90th Street; Wards Island Bridge at 103rd Street; East Harlem esplanade condition
  3. 'Insulting'! To Avoid Disrupting Car Traffic On The FDR, DOT Forces Parks To Scale Back Greenway Fix — Streetsblog NYC (Aug. 29, 2026) · press · checked Oct 14, 2026
    Supports: Parks and EDC scaled back the East Harlem esplanade rebuild; 94th to 105th streets to be patched rather than rebuilt; crumbling path

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.