States › Missouri

Fishing River Trail

Greenway in Missouri

Runs through Kearney · Clay County

Conditions now

Loading the weather near Kearney…

Forecast by the National Weather Service for Kearney · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.8 mi 6.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West 19th Street mile 0.2 directions to trailhead 1
  2. Parking at East 19th Street mile 3.4 directions to trailhead 2
  3. Parking at East 19th Street mile 3.8 directions to trailhead 3
  4. Parking at East 19th Street mile 3.8 directions to trailhead 4
Fishing River Trail (opens in a new tab)
Photo: kc3910 · CC BY-SA 4.0 · Mapillary

About this trail

The Fishing River Trail is a paved trail in Kearney, Missouri, one of the trails in the City of Kearney's park system. It is not a rail-trail. The city's trail brochure calls it Kearney's southernmost trail, located south of 19th Street between Petty Road and the high school property, and describes a meandering 3.76-mile route through semi-wooded areas and along the outside edge of the town's fastest-growing housing development.

The brochure points to sites along the trail: the planned future municipal pool site at the corner of 19th Street and Jefferson Street, and a 12-court pickleball complex and skate park that it said would be completed in May 2023. Trailhead parking in BikeTheRail's data, drawn from OpenStreetMap, is along East and West 19th Street. The line on this page covers about 3.8 miles.

The city counts the Fishing River Trail among more than 7 miles of paved trails in Kearney, along with the Mack Porter Park Trail and the Jesse James Park Trail, and its brochure says that with the passage of the 2021 use tax the city is working toward connecting all of its trails by sidewalk. The city presents its trails as walking trails; OpenStreetMap maps the Fishing River Trail as an asphalt path designated for bicycles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kearney 3e, 3.1 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384355667584888780685542
Low °F172131415263676455433122
Precipitation, in1.31.62.54.15.25.25.444.93.22.11.7
Snow, in56.520.1000000.30.94.6
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Independence sheet (1:125,000); the 1945 Kearney sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kearney Trails System (trail brochure, PDF) — City of Kearney, Missouri · government source · checked Oct 15, 2026
    Supports: southernmost trail; south of 19th Street between Petty Road and the high school property; meandering 3.76-mile trail through semi-wooded areas and along the edge of the fastest-growing housing development; planned future municipal pool site at 19th St and Jefferson St; 12-court pickleball complex and skate park to be completed in May 2023; over 7 miles of walking trails; Mack Porter Park Trail and Jesse James Park Trail; 2021 use tax and goal of connecting trails via sidewalk
  3. Parks and Recreation — City of Kearney, Missouri · government source · checked Oct 15, 2026
    Supports: over 7 miles of paved trails in the city park system; walking trails presented for walking and jogging
  4. OpenStreetMap ways for this trail · web · checked Oct 15, 2026
    Supports: trailhead parking along East and West 19th Street; mapped line of about 3.8 miles; asphalt path tagged as a cycleway designated for bicycles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.