Five Mile Creek Greenway
Rail-trail in Alabama · OpenStreetMap relation
Runs through Mount Olive (Jefferson County), Brookside, Gardendale and Fultondale · Jefferson County
Conditions now
Loading the weather near Gardendale…
Forecast by the National Weather Service for Gardendale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Powder Mill Road mile 2.1 directions to trailhead 1
- Parking at Yaebrough Road mile 7.7 directions to trailhead 2
- Parking at Yaebrough Road mile 7.8 directions to trailhead 3
(opens in a new tab) About this trail
The Five Mile Creek Greenway is a crushed-gravel rail-trail in north Jefferson County, Alabama, between Fultondale and Brookside. It is the main project of the Five Mile Creek District, formally the Five Mile Creek Greenway Capital Improvement Cooperative District, formed in 2002 by Brookside, Center Point, Fultondale, Gardendale, Graysville and Tarrant to improve water quality and provide outdoor recreation in the Five Mile Creek watershed. In July 2018 the district bought a 16.5-mile former CSX rail corridor from Fultondale to Graysville, using a federal transportation grant and $373,000 in local matching funds. The greenway belongs to Jefferson County's Red Rock Trail System, and the Freshwater Land Trust has facilitated its construction.
The rail-trail opened in pieces. In June 2019 a two-mile Gardendale section opened from Jew Hollow Road across Fieldstown Road to Shady Grove Road, where it joins Fultondale's Black Creek Park Trail. A two-mile extension opened on June 2, 2023, carrying the trail to Newfound Creek at 4250 Powder Mill Road in Brookside and making the greenway 8.25 miles long from Fultondale's Black Creek Park, the longest existing trail in the Red Rock system at the time. This record's map line covers that route, about 7.9 miles.
The trail is flat and partly shaded, open to pedestrians and cyclists, and closed to motor vehicles. Trailheads are at Black Creek Park, Shady Grove Road, Fieldstown Road, Jew Hollow Road and the Brookside gateway at Newfound Creek. The district's plans call for building out the full 16.5-mile corridor and adding connections to Tarrant and Center Point, whose existing pieces of the wider greenway include Tarrant's 2.5-mile Aqueduct Trail and a mile of trail at Center Point's Reed Harvey Park.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
77% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Birmingham Airport, 11.9 km from the trail's middle, 19 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 59 67 75 82 88 91 91 86 76 65 57 Low °F 35 38 45 52 61 68 72 71 65 54 43 38 Precipitation, in 5 5 5.7 5.1 4.9 4.8 5.4 4.3 4 3.3 4.2 4.9 Snow, in 0.4 0.3 0.5 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Birmingham sheet (1:125,000); the 1959 Gardendale sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFive Mile Creek — Freshwater Land Trust
- RedditSearch Reddit: r/Alabama
Nearby trails
- North Aqueduct Greenway 2.4 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16809912, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Five Mile Creek — Freshwater Land Trust · organization · checked Oct 16, 2026 Supports: district members and 2002 formation, purpose, July 2018 purchase of the 16.5-mile CSX corridor from Fultondale to Graysville
- District purchases rail corridor, opens new trail — Freshwater Land Trust (June 12, 2019) · organization · checked Oct 16, 2026 Supports: federal grant and $373,000 match, Gardendale section from Jew Hollow Road to Shady Grove Road and Black Creek Park Trail, crushed gravel, flat and partly shaded, pedestrians and cyclists, no motor vehicles, trailheads, plans for Tarrant and Center Point connections, Aqueduct Trail and Reed Harvey Park
- OPEN NOW: Extension of the Five Mile Creek Greenway makes it the longest trail in the Red Rock Trail System — Bham Now (June 2, 2023) · web · checked Oct 16, 2026 Supports: two-mile extension to Newfound Creek (4250 Powder Mill Rd) in Brookside, 8.25 miles from Black Creek Park, longest existing Red Rock trail, district's formal name, Freshwater Land Trust facilitation, Brookside gateway
- Five Mile Creek Greenway (relation 16809912) — OpenStreetMap · web · checked Oct 16, 2026 Supports: length of this record's map line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.