States › Nevada

Flamingo Arroyo Trail

Greenway in Nevada · OpenStreetMap relation

Runs through Paradise, Winchester, Sunrise Manor and Whitney · Clark County

Conditions now

Loading the weather near Sunrise Manor…

Forecast by the National Weather Service for Sunrise Manor · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
8.6 mi 13.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Hollywood Boulevard mile 0 directions to trailhead 1
  2. Parking at South Hollywood Boulevard mile 0.1 directions to trailhead 2
  3. Parking at South Hollywood Boulevard mile 0.2 directions to trailhead 3
  4. Parking at South Hollywood Boulevard mile 1.4 directions to trailhead 4
  5. Parking at Sleepy Fawn Drive mile 3.6 directions to trailhead 5
  6. Parking at East Sahara Avenue mile 3.7 directions to trailhead 6
  7. Parking at East Sahara Avenue mile 3.7 directions to trailhead 7
  8. Parking at East Sahara Avenue mile 3.7 directions to trailhead 8
  9. Parking at South Sloan Lane mile 3.7 directions to trailhead 9
  10. Parking at Crowley Way mile 3.7 directions to trailhead 10
  11. Parking at East Sahara Avenue mile 4.7 directions to trailhead 11
  12. Parking at East Sahara Avenue mile 4.7 directions to trailhead 12
  13. Parking at South Nellis Boulevard mile 4.8 directions to trailhead 13
  14. Parking at South Nellis Boulevard mile 4.8 directions to trailhead 14
  15. Parking at South Nellis Boulevard mile 4.8 directions to trailhead 15
Flamingo Arroyo Trail (opens in a new tab)
Photo: hshearer · CC BY-SA 4.0 · Mapillary

About this trail

The Flamingo Arroyo Trail is a paved multi-use path along the Flamingo Wash in the Las Vegas Valley of Clark County, Nevada, listed in OpenStreetMap at about 8.6 miles. Clark County describes it as part of the Las Vegas Valley primary trails network and an important link to the trails of the City of Henderson.

The eastern end is the oldest piece. Clark County says Phase I opened in 2008, spans 2.5 miles between Vegas Valley Drive and the Sunrise Trailhead on the northern boundary of Clark County Wetlands Park, and was the first stretch of the trail. A connection from there leads into the Wetlands Park and on to Henderson trails and the River Mountains Loop Trail. Phase II, completed in fall 2010, added trailheads near Pecos McLeod, Lamb Boulevard and Sloan Lane, plus benches, signs, entry archways and shade shelters designed by artists.

The county describes a three-mile section from Stephanie Street to I-515 that combines on-street connections on Nellis Boulevard and Sahara Avenue with off-street segments beside the wash between Nellis and I-515. Some parts are lighted for night use. Cyclists traveling west to east transition from trail to street at one point along that section.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
N Las Vegas, 11.3 km from the trail's middle, 51 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F616573808910110610497847059
Low °F384149556473797870574537
Precipitation, in0.60.80.50.20.200.30.30.30.40.30.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Las Vegas sheet (1:250,000); the 1967 Las Vegas NE sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13665267, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Completed Trail Projects — Clark County, Nevada · government source · checked Oct 17, 2026
    Supports: network role, Phase I (2008, 2.5 miles, Sunrise Trailhead), Phase II (2010 amenities), Stephanie Street to I-515 section, lighting, on-street connections
  3. OpenStreetMap relation 13665267 — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name and length of this record

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.