Flint River Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Burlington · Des Moines County
Conditions now
Loading the weather near Beaverdale…
Forecast by the National Weather Service for Beaverdale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- South Auditorium Lot mile 0 directions to South Auditorium Lot
- North Auditorium Lot mile 0.1 directions to North Auditorium Lot
- Parking at Washington Street mile 0.1 directions to trailhead 3
- Port of Burlington Lot mile 0.2 directions to Port of Burlington Lot
- Parking at Columbia Street mile 0.2 directions to trailhead 5
- Parking at North Front Street mile 0.2 directions to trailhead 6
- North Boat Ramp Lot mile 0.3 directions to North Boat Ramp Lot
- Parking at North Front Street mile 0.4 directions to trailhead 8
- Parking at North Front Street mile 0.8 directions to trailhead 9
Plan your visit
- Official pageFlint River Trail flintrivertrail.org
- By trainAmtrak: Burlington, IA (BRL) 0.2 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); Iowa DOT Trail Amenities (CC BY 4.0).
(opens in a new tab) About this trail
The Flint River Trail is a partly built hiking and bicycling trail in Des Moines County, Iowa, planned to run about 20 miles through the Flint River valley from downtown Burlington to the Big Hollow Recreation Area. The City of Burlington and Des Moines County are building it together; the project began as part of the Great River Gateway Vision Iowa project, which also funded other city and county attractions. By 2018 the trail had received more than $5.5 million in state and federal grants along with local contributions, and the Southeast Iowa Regional Planning Commission described it as 65 to 75 percent complete, with work underway in Starr's Cave Park and Preserve.
On the county side, a 7-mile section from Flint Bottom Road to Big Hollow opened to the public in October 2013. On the city side, the trail runs from the Port of Burlington to Mill Dam Road near the Leopold Recreation Area. When finished, the route is to connect the Mississippi River Trail, downtown Burlington, the Port of Burlington, Riverside Park, Starr's Cave Park and Preserve, Hickory Bend Recreation Area, Historic Zion School and Big Hollow, and is planned to be mostly separated from roads. In 2018 one remaining gap was the stretch from the western edge of Starr's Cave to Highway 61 and Upper Flint Road north of Burlington, where the trail is to pass under the highway.
The trail is open sunrise to sunset. Motorized vehicles other than those needed for ADA access, horses, alcohol, fires and grills are prohibited, pets must be leashed, and users must stay on the trail and off adjacent private property. The county warns that the trail may be slippery or blocked by debris.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Burlington Municipal Airport, 9.8 km from the trail's middle, 33 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 37 50 63 73 82 85 84 78 64 50 37 Low °F 16 20 31 42 53 63 66 64 56 44 32 22 Precipitation, in 1.4 1.7 2.4 3.9 4.9 4.9 4 3.8 3.5 3.1 2.3 1.9 - On the National Register
- Flint River Bridge, Burlington · structure · nomination file for Flint River Bridge
- Burlington, Cedar Rapids & Northern Freight House, Burlington · building, listed 1983 · nomination file for Burlington, Cedar Rapids & Northern Freight House
- Downtown Commercial Historic District, Burlington · historic district, listed 2015
- Old maps
USGS topographic maps of the trail's middle go back to the 1934 Burlington sheet (1:48,000); the 1964 West Burlington sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Iowa
Nearby trails
- Hoover Nature Trail within 0.2 mi · 25.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12607266, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Flint River Trail — Conservation — Des Moines County, Iowa · government source · checked Oct 14, 2026 Supports: portions still in planning and construction; 7-mile county section from Flint Bottom Road to Big Hollow opened October 2013; city section from the Port of Burlington to Mill Dam Road near Leopold Recreation Area; about 20 miles from downtown Burlington to Big Hollow when complete; places it will connect; primarily separated from roadways; Great River Gateway Vision Iowa origin; city and county cooperation; rules and sunrise-to-sunset hours
- Flint River Trail Construction Continues, Completion Still Several Years Out — Tri States Public Radio (August 2, 2018) · organization · checked Oct 14, 2026 Supports: more than $5.5 million in state and federal grants plus local contributions; 65-75 percent complete in 2018 per the Southeast Iowa Regional Planning Commission; work in Starr's Cave Park and Preserve; remaining section from the preserve's western edge to Highway 61 and Upper Flint Road, crossing under the highway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.