Flushing River Trail
Greenway in Michigan
Runs through Flushing Township and Flushing · Genesee County
Conditions now
Loading the weather near Flushing…
Forecast by the National Weather Service for Flushing · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Main Street mile 0.1 directions to trailhead 1
(opens in a new tab) About this trail
The Flushing River Trail is a paved path of about 1.4 miles in the city of Flushing, Michigan, along the Flint River. The name comes from OpenStreetMap; the City of Flushing's parks page describes what appears to be the same path as the Riverview Trail, a non-motorized path of 1.4 miles that starts at the Main Street Bridge and runs through forest and wetlands along the river.
The city describes bridges of 72 feet over Cole Creek and 200 feet over the Flint River, and OpenStreetMap shows two wooden bridges on the path. The trail was funded by the federal Surface Transportation Enhancement Activities fund through the Michigan Department of Transportation and was a joint project of the City of Flushing, Flushing Township and Genesee County Parks and Recreation. The city's Crekview Trail, a 2,613-foot extension, links Aberdeen Court and Lynn Street with Winters Eave in the city's southwest corner, with hot-mix asphalt, concrete and boardwalk sections; the City Council awarded its construction contract in April 2018.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
49% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Flint 7w, 8.2 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 43 56 68 78 82 79 73 60 47 35 Low °F 16 16 24 35 46 56 60 59 51 40 30 22 Precipitation, in 2.1 1.7 1.9 3.4 3.7 3.1 3.4 3.3 2.9 3 2.4 2.1 Snow, in 13.1 10.4 4.3 1.2 0 0 0 0 0 0.1 1.7 9.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1919 Burt sheet (1:62,500); the 1969 Flushing sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Riverview Trail — City of Flushing · web · checked Oct 18, 2026 Supports: 1.4 miles, start at Main Street Bridge, bridges, funding, partners, Crekview extension
- OpenStreetMap ways named Flushing River Trail (306058407 and neighbors) · web · checked Oct 18, 2026 Supports: name, asphalt surface, two wooden bridges
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.