States › Maryland

Easton Rail-Trail

Rail-trail in Maryland · OpenStreetMap relation

Runs through Easton · Talbot County

Conditions now

Loading the weather near Easton…

Forecast by the National Weather Service for Easton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
On former railbed
2.2 mi 80%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Washington Street mile 0 directions to trailhead 1
  2. Parking at North Washington Street mile 0.1 directions to trailhead 2
  3. Parking at North Washington Street mile 0.2 directions to trailhead 3
  4. Parking at Chapel Road mile 0.3 directions to trailhead 4
  5. Parking at North Washington Street mile 0.3 directions to trailhead 5
  6. Parking at Chapel Road mile 0.3 directions to trailhead 6
  7. Parking at Pennsylvania Avenue mile 1.3 directions to trailhead 7
  8. Parking at Pennsylvania Avenue mile 1.4 directions to trailhead 8
  9. Parking at East Avenue mile 1.5 directions to trailhead 9
  10. Parking at East Dover Street mile 1.5 directions to trailhead 10
  11. Parking at East Avenue mile 1.5 directions to trailhead 11
Easton, along the trail (opens in a new tab)
Easton, along the trail · Photo: Mellowcream · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Easton Rail-Trail is a paved rail-trail running north to south through the town of Easton in Talbot County, Maryland. The Maryland Department of Natural Resources describes it as running from Idlewild Avenue in the heart of Easton to Tanyard Branch, connecting Idlewild Park at the south end of town with North Easton Park at the north end. Its initial 2.5-mile paved segment was completed in 1998. The trail reuses part of a rail corridor that once carried the Pennsylvania Railroad and the Maryland & Delaware Railroad; according to Talbot Thrive, a local trail group, the Maryland Department of Transportation (MDOT) has owned the corridor since 1982, and it was rail-banked in 2013.

Talbot County's tourism office describes a paved network for walkers and cyclists that has been expanded since 1998 and now runs 5 miles. The town has restored a historic railroad station along the trail, which serves as a museum, visitors center and offices for nonprofit organizations. The route mapped here, about 2.8 miles, runs south from North Washington Street.

The state plans to extend the corridor north toward Cordova and Queen Anne as the Frederick Douglass Rail Trail, a 10-foot-wide shared-use path from Black Dog Alley, just north of Easton, toward Tuckahoe State Park. In April 2025 MDOT announced federal Carbon Reduction Grant funding for feasibility and design work between Easton and Tuckahoe State Park. WBOC reported in April 2026 that the roughly 10-mile project, led by MDOT and the Federal Highway Administration, was still in early design, that construction was not expected to begin until at least 2029, and that some farmers along the route opposed it.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Oxford Secondary, abandoned 1957 (STB docket FD-19695). From MDOT SHA Railroad Centerline Routes.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Royal Oak 2 SSW, 12.6 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F454756677584888680695849
Low °F293037475666706862514133
Precipitation, in3.53.14.43.7444.34.84.24.43.43.9
Snow, in5.14.82.30.100000001.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1898 Choptank sheet (1:125,000); the 1942 Easton sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15031308, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rails-to-Trails — Maryland Trails, Maryland Department of Natural Resources · government source · checked Oct 14, 2026
    Supports: Easton Rail-Trail name, Idlewild Avenue to Tanyard Branch, initial 2.5-mile paved segment completed in 1998, Idlewild Park to North Easton Park, future expansion north to Cordova, restored railroad station as museum, visitors center and nonprofit offices
  3. The Frederick Douglass Rail Trail — Talbot Thrive · organization · checked Oct 14, 2026
    Supports: former Pennsylvania Railroad and Maryland & Delaware Railroad corridor, MDOT ownership since 1982, rail-banking completed 2013, corridor already a trail within Easton, planned 10-foot-wide shared-use path from Black Dog Alley just north of Easton to north of Queen Anne with a link to Tuckahoe State Park, April 2025 Carbon Reduction Grant funding for feasibility and design
  4. Easton Rails-To-Trails — Tour Talbot (Talbot County tourism) · organization · checked Oct 14, 2026
    Supports: paved network for walkers and cyclists, first opened 1998, expanded, now 5 miles
  5. State proposal for Frederick Douglass Rail Trail draws mixed reaction on Midshore — WBOC (April 27, 2026) · web · checked Oct 14, 2026
    Supports: about 10 miles between Tuckahoe State Park and Easton, MDOT and FHWA leading early design, construction not before 2029, farmer opposition
  6. OpenStreetMap relation 15031308 · web · checked Oct 14, 2026
    Supports: mapped route of about 2.8 miles beginning at North Washington Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.