Gate-Belmore Trail
Greenway in Washington
In Thurston County
Conditions now
Loading the weather near Rochester…
Forecast by the National Weather Service for Rochester · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Gate-Belmore Trailhead mile 0.7 directions to Gate-Belmore Trailhead
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Gate-Belmore Trail, also called the Gate to Belmore Trail, is a developing rail trail in Thurston County, Washington, planned to run about 14.5 miles on a former railroad line built in the 1890s, later owned by BNSF. It links Belmore, Littlerock and Gate near Black Lake. Thurston County Public Works manages it and acquired a 12.5-mile section of the corridor in 1996.
The county held a ribbon-cutting on July 25, 2025 for the first phase, a 2.7-mile section near the Glacial Heritage Wildlife Area Unit that Wikipedia describes as paved. The planned route begins at Kenneydell Park south of Tumwater, passes Mima Mounds Natural Area Preserve, Glacial Heritage Preserve, the Black River Habitat Management Area and Capitol State Forest, crosses the Black River, and ends southwest of Littlerock at Gate. When complete, the county says, the trail will connect with more than 50 miles of regional trails, including Kenneydell Park, the Black River and Mima Mounds.
The rest of the corridor is not yet developed for riding.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former BNSF Railway line. From Rail Lines of Washington State (WSDOT).
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Olympia Airport, 15.1 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 49 54 59 66 71 78 78 72 60 51 45 Low °F 33 32 34 38 43 47 51 50 46 40 36 33 Precipitation, in 7.8 5.1 5.7 3.7 2.3 1.5 0.5 1 2 5.1 8.2 7.8 Snow, in 2 0.6 0.1 0 0 0 0 0 0 0 0 1.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1941 Gate sheet (1:62,500); the 1953 Rochester sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesGate-Belmore Trail - Thurston County Public Works news
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Gate-Belmore Trail Open - Thurston County · government source · checked Oct 17, 2026 Supports: July 25, 2025 ribbon-cutting, first phase, 1890s rail route, manager, regional connections
- Gate to Belmore Trail - Wikipedia · organization · checked Oct 17, 2026 Supports: 14.5-mile plan, route and landmarks, 1996 county acquisition, 2.7-mile paved first section, BNSF history
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.