States › Michigan

Grand Curve Cycle Path

Greenway in Michigan

Runs through Midland · Midland County

Conditions now

Loading the weather near Midland…

Forecast by the National Weather Service for Midland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.0 mi 6.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Patrick Road mile 0.1 directions to trailhead 1
  2. Parking at East Patrick Road mile 0.1 directions to trailhead 2
  3. Parking at Todd Street mile 0.1 directions to trailhead 3
  4. Parking at East Patrick Road mile 0.3 directions to trailhead 4
  5. Parking at East Patrick Road mile 0.4 directions to trailhead 5
  6. Parking at East Patrick Road mile 1.5 directions to trailhead 6
  7. Parking at East Patrick Road mile 1.7 directions to trailhead 7
  8. Parking at East Patrick Road mile 1.7 directions to trailhead 8
  9. Parking at East Patrick Road mile 1.7 directions to trailhead 9
  10. Parking at East Patrick Road mile 1.9 directions to trailhead 10
  11. Parking at East Patrick Road mile 1.9 directions to trailhead 11
  12. Parking at Washington Street mile 2.1 directions to trailhead 12
  13. Parking at Discovery Way mile 2.1 directions to trailhead 13
  14. Parking at East Patrick Road mile 2.2 directions to trailhead 14
  15. Parking mile 2.4 directions to trailhead 15
  16. Parking at Bayliss Street mile 2.4 directions to trailhead 16
  17. Parking at Bayliss Street mile 2.4 directions to trailhead 17
  18. Parking at Bayliss Street mile 2.4 directions to trailhead 18
  19. Parking at State Street mile 3.4 directions to trailhead 19
  20. Parking at Ellsworth Street mile 3.4 directions to trailhead 20
  21. Parking at State Street mile 3.5 directions to trailhead 21
  22. Parking at East Main Street mile 3.6 directions to trailhead 22
  23. Parking at Cronkright Street mile 3.7 directions to trailhead 23
  24. Parking at Wyman Street mile 3.8 directions to trailhead 24
  25. Parking at McDonald Street mile 3.8 directions to trailhead 25
  26. Parking at Wyman Street mile 3.9 directions to trailhead 26
  27. Parking at Wyman Street mile 3.9 · restrooms · water directions to trailhead 27
  28. Parking at Wyman Street mile 3.9 · restrooms directions to trailhead 28
  29. Parking at Ann Street mile 3.9 · restrooms directions to trailhead 29
  30. Parking at Wyman Street mile 4 · restrooms · water directions to trailhead 30
The Tridge, beside the trail (opens in a new tab)
The Tridge, beside the trail · Photo: Phil Squattrito · CC BY 2.0 · Wikimedia Commons

About this trail

The Grand Curve Trail is a paved path of about 4.2 miles in Midland, Michigan, running east from the Tridge in downtown Midland to Patrick Road at Illinois Drive. Go Great Lakes Bay, the regional visitors bureau, gives its length as 4.25 paved miles and notes that dogs are welcome. TrailLink credits the trail to the City of Midland. The record here maps about 4 miles under the name Grand Curve Cycle Path.

The trail starts at the rotunda that hosts the Midland Area Farmers Market, beside the Tridge, a three-way bridge over the confluence of the Chippewa and Tittabawassee rivers. It follows the Tittabawassee, skirts the Dow Diamond ballpark and runs through a linear park that includes Fournie Park. At Washington Street it crosses to the south side of Patrick Road and continues to Illinois Drive. At the west end, the Pere Marquette Rail Trail runs 30 miles to Clare, and the Chippewa Trail crosses the Tridge and leads about 4 miles to the Chippewa Nature Center. TrailLink lists parking at the farmers market lot at the end of Ashman Road, 111 West Main Street.

The City of Midland scheduled an open house for August 26, 2025, on a proposed East Patrick Road Multi-Use Path. It would extend the path on the south side of Patrick Road from east of Illinois Drive to the eastern city limits, then continue into Williams Township as part of a proposed Bay County connector trail along West North Union Road and a utility easement to West Midland Road. WNEM reported that the planning pilot, coordinated by the Midland Area Transportation Study, would let the city and its road commission partner seek federal Transportation Alternatives Program money covering 50 to 80 percent of construction; the report gave no construction date.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Midland, 1.1 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F293243566878828073604634
Low °F171825364857626052423223
Precipitation, in21.923.53.73.72.83.22.83.12.61.9
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Midland sheet (1:250,000); the 1962 Midland South sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Where Are the Best Nature Trails for Hiking & Biking in Bay City, Midland, and Saginaw, MI? — Go Great Lakes Bay · web · checked Oct 15, 2026
    Supports: name Grand Curve Trail; 4.25 paved miles from the Tridge to Patrick/Illinois; dogs welcome; Chippewa Trail four miles to Chippewa Nature Center; Pere Marquette Rail Trail paved 30 miles to Clare from the Tridge
  3. Grand Curve Trail — TrailLink · web · checked Oct 15, 2026
    Supports: 4.2 miles, asphalt; route from the farmers market rotunda near the Tridge along the Tittabawassee, past Dow Diamond, through Fournie Park, south side of Patrick from Washington Street to Illinois Drive; City of Midland; parking at the farmers market lot, 111 W Main St
  4. Midland invites community to open house on a multi-use path proposal — WNEM (August 15, 2025) · web · checked Oct 15, 2026
    Supports: August 26, 2025 open house; proposed East Patrick Road Multi-Use Path from east of Illinois Drive to the eastern city limits and into Williams Township as part of a Bay County connector trail; MATS-coordinated TAP pilot; grant could cover 50 to 80 percent

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.