States › Colorado

Great Western Trail

Rail-trail in Colorado · OpenStreetMap relation

Runs through Severance, Windsor and Westminster · Weld and Jefferson counties

Conditions now

Loading the weather near Windsor…

Forecast by the National Weather Service for Windsor · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
12.0 mi 19.3 km1
On former railbed
10.6 mi 88%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 1 directions to trailhead 1
  2. Parking at 2nd Avenue mile 7.4 directions to trailhead 2
  3. Parking at Lake View Drive mile 7.8 directions to trailhead 3
  4. Parking at West Westmoor Circle directions to trailhead 4
  5. Parking at North Simms Street directions to trailhead 5
Westminster, along the trail (opens in a new tab)
Westminster, along the trail · Photo: Jeffrey Beall · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Great Western Trail is a 10.5-mile rail-trail in rural Weld County, Colorado, linking the towns of Windsor, Severance and Eaton on the railbed of the Great Western Railroad. The railroad built 12.6 miles of track between Eaton and Windsor in 1905 to carry sugar beets to processing plants; passenger service ended in 1972, and the line sat idle after the Great Western Sugar Company switched to trucks in 1977. Its owner, Omnitrax, railbanked the corridor in 2004 and the rails and ties were removed. The Great Western Trail Authority, a local government entity created by an intergovernmental agreement among the three towns in 2006, holds the right-of-way and builds and maintains the trail; its nine board members are appointed three per town.

The trail leaves the Windsor trail system on the northeast edge of Windsor and runs north about 3 miles to the center of Severance, then curves east for 7.5 miles through farmland to Cheyenne Avenue in Eaton. The first 2.5 miles, southwest from County Road 74 in Severance, opened on September 20, 2008; the Severance-Windsor section received a crusher-fines surface in 2014, 5.5 miles west from Eaton opened in 2020, and the final 1.5 miles east of Severance were completed in August 2023, opening the whole trail.

The trail is wide, gently graded and surfaced with crusher fines, not pavement. It crosses irrigation ditches on converted trestles, including the John Law Ditch and Greeley No. 2 Ditch trestles, which have concrete decks and railings, and a bridge over the Roullard Ditch. The OpenStreetMap relation behind this page also takes in a separate, unrelated path of about 1.4 miles with the same name in Westminster, near Westmoor Circle and Simms Street.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Greeley Unc, 17.4 km from the trail's middle, 23 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444859667586928982685443
Low °F182028354454595749372618
Precipitation, in0.50.50.91.82.61.81.61.61.11.10.70.6
Snow, in5.75.15.13.70.50000.53.35.45.6
Old maps

USGS topographic maps of the trail's middle go back to the 1902 Greeley sheet (1:125,000); the 1951 Bracewell sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3012088, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Great Western Trail | Windsor – Severance – Eaton · web · checked Oct 17, 2026
    Supports: 10.5-mile length open end to end August 2023; route from Windsor trail system north about 3 miles to Severance, then east 7.5 miles to Cheyenne Avenue in Eaton; abandoned Great Western Railroad bed, railbanked; wide, gentle grade, crusher fines surface
  3. The Story behind the Great Western Trail — Great Western Trail · web · checked Oct 17, 2026
    Supports: 1905 railroad of 12.6 miles Eaton-Windsor for sugar beets; passenger service ended 1972; trucks from 1977; railbanked 2004 by Omnitrax, rails and ties removed; GWTA formed 2006 and IGA; 2.5 miles opened September 20, 2008 from CR 74 in Severance; John Law and Greeley No. 2 trestles with concrete decking and railings; 2014 crusher-fines upgrade; 2020 construction; final section 2023
  4. About the Great Western Trail Authority — Great Western Trail · web · checked Oct 17, 2026
    Supports: GWTA a local government entity created by IGA among Windsor, Severance and Eaton to accept the railbanked corridor; plans, builds and maintains the trail; nine board members, three per town
  5. News — Great Western Trail · web · checked Oct 17, 2026
    Supports: 5.5 miles west from Eaton complete November 2020; steel bridge over the Roullard Ditch; final 1.5 miles completed August 2023
  6. Relation 3012088: Great Western Trail — OpenStreetMap · web · checked Oct 17, 2026
    Supports: record includes a separate same-name path of about 1.4 miles in Westminster (geometry and trailheads near West Westmoor Circle and North Simms Street)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.