States › Colorado

Greenway Trail

Greenway in Colorado

Runs through Idaho Springs · Clear Creek County

Conditions now

Loading the weather near Idaho Springs…

Forecast by the National Weather Service for Idaho Springs · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Whitewater Road mile 0 directions to trailhead 1
  2. Parking at Riverside Drive mile 1 directions to trailhead 2
  3. Parking at Colorado Bikeway mile 1 directions to trailhead 3
  4. Parking at Riverside Drive mile 1.7 · restrooms directions to trailhead 4
  5. Parking at Colorado Boulevard mile 1.8 · restrooms directions to trailhead 5
  6. Parking at Miner Street mile 1.8 · restrooms directions to trailhead 6
  7. Parking at Colorado Boulevard mile 1.8 · restrooms directions to trailhead 7
  8. Parking at Riverside Drive mile 1.9 directions to trailhead 8
Argo Tunnel and Mill (opens in a new tab)
Argo Tunnel and Mill · Photo: Int77345 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Idaho Springs section of the Clear Creek Greenway is a concrete path along Clear Creek in Idaho Springs, Clear Creek County, Colorado. Clear Creek County lists the Greenway as the Peaks-to-Plains trail within the county. In September 2019 the city of Idaho Springs hosted a ribbon cutting for a 2-mile (3.2 km) section of the Greenway from the roundabout on the east end of town to Interstate 70 exit 239, with two bridges over Clear Creek. A Colorado Department of Transportation (CDOT) project, listed as running from September 2021 to August 2022 at a cost of $3.8 million, built a separated shared-use path from east Idaho Springs to I-70 over Clear Creek west of the Veterans Memorial Tunnel: a 10-foot-wide (3 m) concrete pathway with two pedestrian bridges just east of Riverside Drive, plus a trailhead at Dumont. CDOT lists the project as complete.

The mapped line, named Greenway Trail in OpenStreetMap, covers about 1.7 miles (2.7 km) in seven pieces, from 23rd Avenue east to a junction with a way named Scott Lancaster Memorial Trail. The county's conditions page lists the Scott Lancaster segment of the Greenway as closed for construction; an entry on that page dated 11/15/2023 gives the section of the Clear Creek Trail from 2 Bears Tap & Grill to Hidden Valley/Central City Parkway as closed indefinitely while underground utilities are buried for the I-70 Floyd Hill project. The county has no plans to plow the path.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June to August. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Evergreen, 19.1 km from the trail's middle, 144 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444451566476817972615144
Low °F121321273643494740292013
Precipitation, in0.60.91.82.42.51.72.22.31.61.20.80.7
Snow, in8.811.41714.92.70001.16.510.48
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1899 West Denver sheet (1:125,000); the 1957 Squaw Pass sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Idaho Springs Clear Creek Greenway Path — Colorado Department of Transportation · government source · checked Oct 31, 2026
    Supports: project at the Clear Creek Greenway near Idaho Springs; separated shared-use path from east Idaho Springs to I-70 over Clear Creek west of the Veterans Memorial Tunnel and a trailhead at Dumont; 10 ft wide concrete pathway with two pedestrian bridges just east of Riverside Drive; $3.8 million; September 2021 to August 2022; Project Complete
  3. Current Conditions — Clear Creek County, CO · government source · checked Oct 31, 2026
    Supports: Clear Creek Greenway (Peaks-to-Plains); 'Scott Lancaster segment closed for construction'; no plans to plow the bike path; entry dated 11/15/2023: the Clear Creek Trail from 2 Bears Tap & Grill (I-70 exit 244) to Hidden Valley/Central City Parkway (I-70 exit 243) closed indefinitely while underground utilities are buried in preparation for the I-70 Floyd Hill project
  4. Idaho Springs marks another milestone with Greenway ribbon-cutting (Clear Creek Courant, September 2019) — My Mountain Town · web · checked Oct 31, 2026
    Supports: ribbon cutting hosted by the City of Idaho Springs (article dated September 24, 2019) for a 2-mile section of the Clear Creek Greenway through Idaho Springs, from the roundabout on the east end of Idaho Springs to Interstate 70 exit 239, with two bridges over Clear Creek
  5. Greenway Trail, way 618139219 — OpenStreetMap · web · checked Oct 31, 2026
    Supports: a way named Greenway Trail tagged highway=cycleway, bicycle=designated, foot=designated, surface=concrete
  6. Scott Lancaster Memorial Trail, way 80908447 — OpenStreetMap · web · checked Oct 31, 2026
    Supports: a way named Scott Lancaster Memorial Trail tagged highway=cycleway, bicycle=designated, foot=designated, surface=asphalt
  7. OpenStreetMap map data for the area of the mapped line — OpenStreetMap · web · checked Oct 31, 2026
    Supports: 23rd Avenue meeting the west end of the mapped line; the Scott Lancaster Memorial Trail way meeting its east end; most of the ways named Greenway Trail tagged surface=concrete

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.