States › Michigan

Gregory K. Baderschneider Riverwalk Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Mount Pleasant · Isabella County

Conditions now

Loading the weather near Mount Pleasant…

Forecast by the National Weather Service for Mount Pleasant · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.3 · restrooms directions to trailhead 1
  2. Parking mile 0.3 · restrooms directions to trailhead 2
  3. Parking at West High Street mile 0.4 · restrooms directions to trailhead 3
  4. Parking at West High Street mile 0.5 · restrooms directions to trailhead 4
  5. Parking at South Leaton Street mile 1 directions to trailhead 5
  6. Parking at South Leaton Street mile 1 directions to trailhead 6
  7. Parking at West Broadway Street mile 1.4 directions to trailhead 7
  8. Parking at West Broadway Street mile 1.4 directions to trailhead 8
  9. Parking at West Broadway Street mile 1.5 directions to trailhead 9
  10. Parking at North Chapel Drive mile 1.6 · restrooms directions to trailhead 10
  11. Parking at West Broadway Street mile 1.6 · restrooms directions to trailhead 11
  12. Parking at West Broadway Street mile 1.6 directions to trailhead 12
  13. Parking at North Chapel Drive mile 1.6 · restrooms directions to trailhead 13
  14. Parking at West Pickard Street mile 1.8 · restrooms directions to trailhead 14
  15. Parking at North Island Park Drive mile 1.8 · restrooms · water directions to trailhead 15
  16. Parking at North Island Park Drive mile 1.8 · restrooms · water directions to trailhead 16
  17. Parking at North Island Park Drive mile 1.8 · restrooms directions to trailhead 17
  18. Parking at South Island Park Drive mile 2 · restrooms · water directions to trailhead 18
  19. Parking at South Island Park Drive mile 2 · restrooms · water directions to trailhead 19
  20. Parking at West Broadway Street mile 2 directions to trailhead 20
  21. Parking at South Island Park Drive mile 2.1 directions to trailhead 21
  22. Parking at North Main Street mile 2.1 directions to trailhead 22
  23. Parking at North Main Street mile 2.1 directions to trailhead 23
  24. Parking at North Island Park Drive mile 2.2 directions to trailhead 24
  25. Parking at North Main Street mile 2.2 directions to trailhead 25
  26. Parking at Lincoln Street mile 2.2 directions to trailhead 26
  27. Parking at North Main Street mile 2.2 directions to trailhead 27
Gregory K. Baderschneider Riverwalk Trail (opens in a new tab)
Photo: treestryder · CC BY-SA 4.0 · Mapillary

About this trail

The Gregory K. Baderschneider Riverwalk Trail, often shortened to the GKB Riverwalk Trail, is a barrier-free path along the Chippewa River in Mt. Pleasant, Michigan. It began as the city's River Walk Trail. On July 13, 2009, the Mt. Pleasant City Commission decided to rename it for Gregory K. Baderschneider, a longtime parks employee who joined the city's parks system in 1990 after 12 years with the Isabella County parks system and who died in October 2008. A dedication was planned for the following spring, together with the opening of the city's Access Adventure Trail.

The Mt. Pleasant Area Convention and Visitors Bureau describes the riverwalk as a three-mile barrier-free pathway that follows the Chippewa River corridor through five major city parks and through the historic downtown; the route mapped here is about 3.1 miles. The Access Adventure Trail, a universally accessible addition, starts at Chipp-A-Waters Park and extends one mile south toward the Central Michigan University campus.

Chipp-A-Waters Park, a 30-acre city park at 1403 West High Street, lies on a state conservation area along the Chippewa River; the city's map of the park shows about 0.9 mile of the GKB Riverwalk Trail within it. City parks are open from 8 a.m. to 11 p.m.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Alma, 26.3 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F293243566878828073604634
Low °F151523344656595850393022
Precipitation, in2.21.82.13.53.73.63.33.72.73.22.72
Snow, in10.79.95.42.1000000.32.78.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1916 Mount Pleasant sheet (1:62,500); the 1943 Mount Pleasant sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11533155, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Parks — City of Mt. Pleasant, MI · organization · checked Oct 15, 2026
    Supports: general park hours 8:00 a.m. to 11:00 p.m.; city maintains the parks
  3. Park List — City of Mt. Pleasant, MI · organization · checked Oct 15, 2026
    Supports: Chipp-A-Waters located on a state conservation area along the Chippewa River; address 1403 W High Street
  4. Chipp-A-Waters Park map — City of Mt. Pleasant · organization · checked Oct 15, 2026
    Supports: 30 acres; 1403 W. High Street; GKB Riverwalk Trail 0.9 mi within the park
  5. Trail to be renamed to honor resident — Central Michigan Life (July 29, 2009) · web · checked Oct 15, 2026
    Supports: River Walk Trail renamed the Gregory K. Baderschneider River Walk Trail by City Commission decision of July 13 (2009); Baderschneider died October 2008; 12 years with Isabella County parks before joining the city's parks system in 1990; dedication planned for spring with the Access Adventure Trail opening
  6. GKB Riverwalk Trail/Access Adventure Trail — Mt. Pleasant Area Convention & Visitors Bureau · web · checked Oct 15, 2026
    Supports: three-mile barrier-free Riverwalk pathway along the Chippewa River through five major city parks and downtown; Access Adventure Trail from Chipp-A-Waters Park one mile south toward CMU; universal access

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.