Guemes Channel Trail
Rail-trail in Washington
Runs through Anacortes · Skagit County
Conditions now
Loading the weather near Anacortes…
Forecast by the National Weather Service for Anacortes · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Oakes Avenue mile 0.1 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Guemes Channel Trail follows an old railroad bed along the north shore of Fidalgo Island in Anacortes, Washington. The City of Anacortes reports about 6,200 feet built, from Edwards Way near the state ferry terminal to the Stabbert Maritime shipyard. Pedestrians, bicycles, e-bikes and dogs are allowed; horses and motorcycles are not.
The trail is not yet built from its western end to the Tommy Thompson Trail near Cap Sante Marina, and the city plans an environmental impact statement for that link once funding is secured. Existing sections were paid for by San Juan Passage permit conditions, private donations and a state grant.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Anacortes, 3.5 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 50 54 59 66 70 75 75 70 61 53 47 Low °F 37 37 40 43 48 52 54 54 51 46 40 36 Precipitation, in 3.9 2.6 2.4 2.1 1.9 1.5 0.8 1.4 1.6 2.8 4.4 3.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Anacortes sheet (1:62,500); the 1951 Anacortes sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Tommy Thompson Parkway 1.8 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Guemes Channel Trail Project — City of Anacortes · government source · checked Oct 17, 2026 Supports: old railroad bed, 6,200 ft built, endpoints, permitted users, gap to Tommy Thompson Trail, funding
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.