Hatcher Creek Greenway
Greenway in North Carolina
Runs through Cary and Morrisville · Wake County
Conditions now
Loading the weather near Morrisville…
Forecast by the National Weather Service for Morrisville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Morrisville-Carpenter Road mile 0 · water directions to trailhead 1
- Parking at Morrisville Square Way mile 0.2 directions to trailhead 2
- Parking at Kudrow Lane mile 1 · restrooms directions to trailhead 3
- Parking at Huntington Park Drive mile 1.3 · restrooms · water directions to trailhead 4
- Parking at Morrisville Carpenter Road mile 1.3 directions to trailhead 5
- Parking at Morrisville Carpenter Road mile 1.3 directions to trailhead 6
- Parking at Morrisville Carpenter Road mile 1.4 directions to trailhead 7
- Parking at Davis Drive mile 1.4 directions to trailhead 8
(opens in a new tab) About this trail
The Hatcher Creek Greenway is a paved greenway in Morrisville, North Carolina, owned by the Town of Morrisville. It was built as part of the Crabtree/Hatcher Creek Greenway project, which representatives of Morrisville, Cary, Wake County and the North Carolina Railroad launched with a groundbreaking at Morrisville Community Park on April 25, 2017. The $5.9 million project was funded largely by a state Department of Transportation grant, with $1.1 million from the town and $570,000 from a Wake County grant. Its designer describes the combined project as about 2.5 miles of asphalt trail, the longest greenway project the town had built.
Our map record covers about 1.9 miles of the Hatcher Creek Greenway and its short connectors. In OpenStreetMap the trail meets the Davis Drive multi-use path at its west end, runs east along Hatcher Creek through Morrisville Community Park, and joins the Crabtree Creek Greenway at its east end, with a trailhead with parking on Morrisville-Carpenter Road. According to its designer, the project gives Morrisville residents access to Lake Crabtree, Umstead State Park, and the Cary and Raleigh greenway systems.
The path is mapped as asphalt and concrete, with several wooden boardwalk sections. The Outbound, a trail listing, describes it as a paved route for walking, running and cycling that also passes the Morrisville Community Library and nearby shopping, and notes that leashed dogs are allowed.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Apex, 8.2 km from the trail's middle, 44 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 51 54 62 72 79 86 89 87 82 72 62 54 Low °F 31 33 39 48 57 65 69 68 62 50 40 34 Precipitation, in 3.6 3 4.1 3.6 3.8 4.3 5.1 4.6 5.3 3.7 3.5 3.7 Snow, in 2.9 1 0.4 0 0 0 0 0 0 0 0.3 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Mar 2024
- What's it like to live in the suburbs of The Triangle? r/NorthCarolina · Mar 2024 · 23 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Look around
Nearby trails
- Crabtree Creek Greenway within 0.2 mi · 4.0 mi, paved
- Davis Drive Streetside Trail 0.3 mi away · 2.3 mi, paved
- Morrisville Parkway Streetside Trail 1.0 mi away · 2.4 mi, paved
- NC 55 Streetside Trail 1.2 mi away · 1.3 mi, paved
- Panther Creek Greenway 1.5 mi away · 2.4 mi, paved
- Shiloh Greenway 1.5 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Morrisville Breaks Ground on New, Connective Greenway — CaryCitizen Archive (April 26, 2017) · web · checked Oct 16, 2026 Supports: groundbreaking April 25, 2017 at Morrisville Community Park by Morrisville, Cary, Wake County and the state railroad; Crabtree-Hatcher Creek Greenway connecting east to the Cary greenway system; $5.9 million cost, mostly NCDOT grant, $1.1 million town, $570,000 Wake County grant
- Crabtree/Hatcher Creek Greenway — Stewart · web · checked Oct 16, 2026 Supports: owner Town of Morrisville; about 2.5 miles of asphalt greenway; longest greenway project for the town; access to Lake Crabtree, Umstead State Park and the Raleigh and Cary greenway systems
- Hatcher Creek Greenway, North Carolina — The Outbound · web · checked Oct 16, 2026 Supports: paved walking, running and biking path; Morrisville Community Library, Community Park and shopping access; connects to the Crabtree Lake/Creek greenway; leashed dogs allowed
- Hatcher Creek Greenway — OpenStreetMap ways (e.g. way 732454124) · web · checked Oct 16, 2026 Supports: mapped length about 1.9 miles with connectors; west end at the Davis Drive multi-use path; through Morrisville Community Park; east end at the Crabtree Creek Greenway; trailhead parking on Morrisville-Carpenter Road; asphalt, concrete and wooden boardwalk sections
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
