States › Massachusetts

Head of the Meadow Bike Trail

Greenway in Massachusetts

Runs through Truro · Barnstable County

Conditions now

Loading the weather near Provincetown…

Forecast by the National Weather Service for Provincetown · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bradford Road mile 0 directions to trailhead 1
  2. Parking mile 1.8 · restrooms · water directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: National Park Service boundaries.

HOM Bike Trail During1 (opens in a new tab)
HOM Bike Trail During1 · Photo: NPS/Karst Hoogeboom · Public domain · National Park Service

About this trail

The Head of the Meadow Bike Trail is a paved bicycle path in Truro, Massachusetts, within Cape Cod National Seashore, which is managed by the National Park Service. The park describes it as a 2-mile trail between a dirt parking lot on High Head Road and Head of the Meadow Beach; the 1.9-mile original trail is what is mapped here. It is one of three bike trails in the seashore.

In 2019 the seashore rehabilitated the 1.9-mile trail with a new base course, widening and resurfacing, and renamed a 0.8-mile segment of the Old King's Highway, from Head of the Meadow Road to Coast Guard Road, the Head of the Meadow Bicycle Trail Connector, so that the route now runs from High Head Road to Coast Guard Road. Two flatter sections of the extension use a permeable, stable surface instead of asphalt, which the Cape Cod Commission identifies as Organic Lock. The work, completed in August 2019 by a contract team led by Henry General Construction of Springfield, was the first construction project to come out of the 2017 Outer Cape Bicycle and Pedestrian Master Plan, prepared by the Cape Cod Commission with the seashore and the towns of Wellfleet, Truro and Provincetown.

The trail is 8 to 10 feet wide in most sections and relatively flat, though some surfaces are bumpy and sand or standing water may collect after storms; the posted speed limit is 10 mph. Parking at High Head Road is free year-round, while parking at Head of the Meadow Beach, which has seasonal restrooms, carries summer fees. Leashed pets are allowed from November 1 to April 30.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

73% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

Old maps

USGS topographic maps of the trail's middle go back to the 1887 Provincetown sheet (1:62,500); the 1958 North Truro sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Head of the Meadow Bike Trail — U.S. National Park Service · government source · checked Oct 13, 2026
    Supports: 2 miles from High Head Road to Head of the Meadow Beach; paved, 8–10 feet wide, bumpy, sand or standing water; 10 mph; parking and fees; restrooms; pets November 1 to April 30
  3. Head of the Meadow Bicycle Trail Reopens — Cape Cod National Seashore (NPS, August 2, 2019) · government source · checked Oct 13, 2026
    Supports: 1.9-mile trail rehabilitated (base course, widening, resurfacing); 0.8-mile Old King's Highway connector to Coast Guard Road; permeable surface on two flatter sections; Henry General Construction; 2017 Outer Cape master plan partners
  4. Current Park Conditions — Cape Cod National Seashore (NPS) · government source · checked Oct 13, 2026
    Supports: three bike trails in the park
  5. Outer Cape Bicycle and Pedestrian Master Plan Recommendations Are Coming to Life — Cape Cod Commission · organization · checked Oct 13, 2026
    Supports: completed August 2019; Organic Lock surface; first construction project from the 2017 master plan

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.