High Bridge Trail
Rail-trail in Virginia · OpenStreetMap relation
Runs through Pamplin City and Farmville · Prince Edward, Cumberland and Nottoway counties
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
High Bridge Trail State Park is a rail trail in Southside Virginia converted from a rail line last belonging to Norfolk Southern.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- High Bridge Trail - Pamplin mile 0 directions to High Bridge Trail - Pamplin
- Pamplin mile 0 directions to Pamplin
- Pamplin mile 1 directions to Pamplin
- Elam mile 4 directions to Elam
- Elam mile 4 directions to Elam
- Prospect mile 7.5 directions to Prospect
- Prospect mile 7.6 · restrooms directions to Prospect
- Tuggle mile 11.5 directions to Tuggle
- Tuggle mile 11.5 · restrooms directions to Tuggle
- Parking at Industrial Park Road mile 15.4 directions to trailhead 10
- Parking at West Third Street mile 15.5 directions to trailhead 11
- Parking at West Third Street mile 15.5 directions to trailhead 12
- Parking at Buffalo Street mile 16.5 directions to trailhead 13
- Parking at Healy Street mile 16.6 directions to trailhead 14
- Parking at Healy Street mile 16.6 directions to trailhead 15
- Parking at Clubhouse Drive mile 16.6 directions to trailhead 16
- Parking at Healy Street mile 16.6 directions to trailhead 17
- Parking at Buffalo Street mile 16.6 directions to trailhead 18
- Parking at Grove Street mile 16.7 directions to trailhead 19
- Parking at Appomattox Street mile 16.8 directions to trailhead 20
- Parking at Beech Street mile 16.8 directions to trailhead 21
- Farmville mile 16.9 directions to Farmville
- Parking at Saint George Street mile 16.9 directions to trailhead 23
- Parking at Randolph Street mile 17 directions to trailhead 24
- Parking at Randolph Street mile 17 directions to trailhead 25
- Parking at West Third Street mile 17 directions to trailhead 26
- Farmer's Market Lot mile 17.1 directions to Farmer's Market Lot
- North Street Lot mile 17.1 · restrooms · water directions to North Street Lot
- Parking at North Street mile 17.1 directions to trailhead 29
- Parking at North Street mile 17.1 directions to trailhead 30
- Depot Lot mile 17.2 · restrooms · water directions to Depot Lot
- Plaza Lot mile 17.2 · restrooms · water directions to Plaza Lot
- Parking at North Main Street mile 17.2 · restrooms · water directions to trailhead 33
- Parking at East 2nd Street mile 17.2 · restrooms · water directions to trailhead 34
- Trailhead at River Road mile 17.8 directions to trailhead 35
- River Road mile 20.7 · restrooms directions to River Road
- Camp Paradise mile 22.5 · restrooms directions to Camp Paradise
- Parking at Camp Paradise Road mile 22.7 directions to trailhead 38
- Rice mile 25.4 · restrooms directions to Rice
- Moran mile 29.3 directions to Moran
- Orchard Road mile 30.4 directions to Orchard Road
Plan your visit
- National Recreation TrailDesignated in 2013 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
High Bridge Trail State Park is a 32.2-mile rail-trail in Southside Virginia, managed by the Virginia Department of Conservation and Recreation for hiking, bicycling and horseback riding. Its surface is finely crushed limestone on the old line's grade of about 0.3 percent. It passes through Pamplin City, Prospect, Farmville, Rice and Burkeville in Cumberland, Nottoway and Prince Edward counties, and it is a National Recreation Trail.
The corridor was part of the railroad between Petersburg and Lynchburg. The South Side Railroad built the High Bridge across the Appomattox River in 1854, on brick piers. On April 7, 1865, Confederate engineers set the bridge on fire as Union troops approached; Union engineers cut a burning span to stop the fire spreading, and trains crossed again on temporary spans from September 1865. Norfolk Southern ran its last train across the bridge on October 26, 2004, and in December 2006 it donated about 31 miles of the abandoned line to the state. The trail opened in stages from August 22, 2008, to September 4, 2010, and the rehabilitated High Bridge opened on April 6, 2012, after 13 months of work. The state acquired the final mile at Pamplin City in 2020.
The High Bridge, more than 2,400 feet long and 125 feet above the Appomattox River, is described by the park as the longest recreational bridge in Virginia; it is a Virginia Historic Landmark and is on the National Register of Historic Places. The nearest lot, High Bridge Station near Rice, is 0.3 mile from the bridge. Other parking is at Pamplin, Elam, Prospect, Tuggle, River Road, Rice and Main Street in Farmville; self-pay lots take cash, checks and cards. The park is open dawn to dusk, and riders must lead horses across bridges. The park has announced that rebuilding the River Road bridge in Farmville will close the trail from Main Street east to Osborne Road through October.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 51% of this route as a trail on former railroad right-of-way.
- Shade
61% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Farmville 2 N, 5.1 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 51 59 69 76 84 88 87 80 71 60 51 Low °F 26 27 34 43 54 63 67 66 59 46 35 29 Precipitation, in 3.5 3 4.1 3.4 4.2 3.3 4 3.6 4.6 3.6 3.4 3.7 Snow, in 0.6 3.1 1 0 0 0 0 0 0 0 0 1.4 - On the National Register
- Farmville Historic District, Farmville · historic district, listed 1989 · nomination file for Farmville Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1891 Farmville sheet (1:125,000); the 1968 Farmville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Three commenters in 2024 and 2025 said a shop right at the trail in Farmville rents bikes, including a two-seat e-bike; one added that e-bikes are allowed. r/gravelcycling, Jan 2022 · r/rva, Jul 2024 · r/nova, Aug 2024
- Riders in 2024 and 2025 said Farmville has ample parking, at the trail entrance and behind a brewery; one described riding both ends and finishing at the brewery as a metric century. r/rva, Jul 2024 · r/gravelcycling, Aug 2025
- In May 2025 several commenters said the high bridge crossing daunted people afraid of heights, though one managed it by staying mid-deck; in 2024 and 2025 two said the area beneath is worth exploring. r/rva, Apr 2024 · r/Virginia, May 2025
- One visitor in May 2026 wrote that the trail has no water and advised packing enough for the whole outing. r/Virginia, May 2026
12 Reddit threads about this trail, Jan 2022 to May 2026
- High Bridge Trail r/gravelcycling · Aug 2025 · 2 comments
- High Bridge Trail, Virginia r/gravelcycling · Jan 2022 · 4 comments
- Have you visited the High Bridge (the State’s longest pedestrian bridge)? r/Virginia · May 2025 · 26 comments
- What should I add to my RVA bucket list? r/rva · Jul 2024 · 26 comments
- Affordable weekend road trips from Nova for wedding anniversary? r/nova · Aug 2024 · 36 comments
- Roving through Virginia with Rover-Dog Friendly “Spot” of the Week: High Bridge Trail State Park r/Virginia · May 2026 · 6 comments
- 1-2 hour road trip suggestions for my older mother? r/rva · Apr 2024 · 14 comments
- Any good picnic spots along 460E? r/Virginia · Mar 2024 · 3 comments
- Riding bikes sometimes, day number ? r/gravelcycling · Oct 2024 · 10 comments
- Hello there r/gravelcycling · Apr 2025 · 8 comments
- Best place for fireflies and the best time as well. r/Virginia · May 2025 · 29 comments
- Is Moving to Virginia in 2024 a bad idea? r/Virginia · May 2024 · 288 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of High Bridge Trail State Park
- Agency noticesHigh Bridge Trail State Park — Virginia DCR
- RedditSearch Reddit: r/Virginia
Nearby trails
- Gallion Multi-Use Trail 3.7 mi away · 1.3 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2702876, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “High Bridge Trail State Park”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5754970, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- High Bridge Trail State Park — Virginia Department of Conservation and Recreation · government source · checked Oct 14, 2026 Supports: 32.2 miles; hiking, bicycling and horseback riding; finely crushed limestone; towns and counties; National Recreation Trail; part of the Petersburg to Lynchburg line; Norfolk Southern donation December 2006; opening stages August 22, 2008 to September 4, 2010; High Bridge opened April 6, 2012 after 13 months of rehabilitation; final mile at Pamplin City 2020; bridge more than 2,400 feet long and 125 feet above the Appomattox, longest recreational bridge in Virginia, VHL and NRHP; parking lots, High Bridge Station 0.3 mile from bridge, self-pay payment methods; dawn to dusk; horses led across bridges; River Road bridge rebuild closing Main Street to Osborne Road through October
- High Bridge Trail State Park — Wikipedia · organization · checked Oct 14, 2026 Supports: 0.3% grade; Southside Railroad built High Bridge in 1854 on brick piers; April 7, 1865 burning and Union engineers cutting a span; traffic resumed September 1865 on temporary spans; last Norfolk Southern train October 26, 2004; about 31 miles donated
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.