States › Indiana

High Rail Trail

Rail-trail in Indiana

Runs through Evansville · Vanderburgh County

Conditions now

Loading the weather near Evansville…

Forecast by the National Weather Service for Evansville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.3 km1
On former railbed
1.3 mi 90%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Washington Avenue mile 0.7 directions to trailhead 1
  2. Parking at South Kerth Avenue mile 1.3 directions to trailhead 2
John W. Boehne House (opens in a new tab)
John W. Boehne House · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

High Rail Trail, as OpenStreetMap names it, is the Hi-Rail Greenway, a paved rail-trail in Evansville, Indiana, that runs beside U.S. 41 on a former railroad bed. City leaders opened it with a ribbon cutting in November 2018. TrailLink describes it as part of the city's Pigeon Creek Greenway Passage trail system.

WNIN reported that the city described the greenway as a 2.5-mile, 10-foot-wide asphalt trail between Riverside Drive and Walnut Street, with nine rest areas, benches, bike racks, more than 200 newly planted trees, landscaping, fencing and solar lights. The $2.2 million project was paid for with a federal matching grant covering 80 percent of the cost; the local share came from grants the city obtained.

The mapped route covers about 1.5 miles along the highway corridor, with access points near Washington Avenue and South Kerth Avenue. OpenStreetMap maps several of its street crossings as signalized.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March, May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Evansville Museum, 2.6 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424858707886898984725847
Low °F273139495867717062514033
Precipitation, in3.53.44.75.24.84.44.53.13.43.343.6
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Henderson sheet (1:48,000); the 1957 Evansville sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Ribbon cutting opens Hi-Rail path — WNIN (Nov. 9, 2018) · organization · checked Oct 15, 2026
    Supports: Hi-Rail Greenway name, November 2018 opening, 2.5 miles on a former railroad bed beside US 41 between Riverside and Walnut, 10-ft asphalt, rest areas, benches, bike racks, trees, fencing, solar lights, $2.2 million cost and funding split
  3. Hi-Rail Greenway | Indiana Trails | TrailLink · web · checked Oct 15, 2026
    Supports: part of the Pigeon Creek Greenway Passage system, endpoints, asphalt
  4. High Rail Trail (way 915303927) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: OSM name, signalized crossings, mapped length and access points

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.