Highway 6 Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Iowa City · Johnson County
Conditions now
Loading the weather near Iowa City…
Forecast by the National Weather Service for Iowa City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Iowa City.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Waterfront Drive mile 2.1 directions to trailhead 1
- Parking at Highway 6 East mile 2.1 directions to trailhead 2
- Parking at Highway 6 East mile 2.5 directions to trailhead 3
- Parking at South Gilbert Street mile 2.7 directions to trailhead 4
- Parking at Highway 6 East mile 2.7 directions to trailhead 5
- Parking at Highway 6 East mile 2.7 directions to trailhead 6
(opens in a new tab) About this trail
The Highway 6 Trail is a concrete side path along US 6 on the southeast side of Iowa City, Iowa, east of the Iowa River. It is not a rail trail; it follows the highway past shopping areas and serves the city's southeastern neighborhoods, and at its west end it connects to the Iowa River Corridor Trail along the river. OpenStreetMap lists the City of Iowa City as its operator.
In October 2022 the city closed Fairmeadows Boulevard between Hollywood Boulevard and Highway 6, one direction at a time, for work on its Highway 6 Trail Project. City planners have said the Highway 1 and 6 trail system is to be completed in 2028, when the Iowa Department of Transportation replaces the Highway 6 bridge over the Iowa River, and the city plans to extend the path east along the highway to Heinz Road.
The line mapped on this page covers about 1.9 miles in three pieces. Parking may be available at businesses along Highway 6.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Iowa City Municipal Airport, 2.2 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 36 50 63 73 83 86 84 78 64 49 36 Low °F 15 18 30 40 52 62 66 63 54 42 30 20 Precipitation, in 1 1.2 2.2 3.8 4.5 5.3 3.9 3.9 3.2 3 2.2 1.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Iowa City sheet (1:62,500); the 1965 Iowa City West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Iowa River Trail - Terry Trueblood to Waterworks Prairie Park within 0.2 mi · 17.3 mi, paved
- Sycamore Greenway Trail 0.4 mi away · 4.0 mi, paved
- Highway 1 Trail 0.4 mi away · 1.7 mi, paved
- Court Hill Trail 0.9 mi away · 1.4 mi, paved
- Willow Creek Trail 1.3 mi away · 3.1 mi, paved
- UIowa Finkbine Trail 1.4 mi away · 2.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19410791, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- TRAFFIC ALERT: Iowa City Highway 6 Trail Project — CBS2 Iowa's News Now (October 5, 2022) · web · checked Oct 15, 2026 Supports: October 2022 Fairmeadows Boulevard closures between Hollywood Boulevard and Highway 6 for the Highway 6 Trail Project
- Project area for Highway 1 and 6 — The Daily Iowan (Datawrapper chart; source Iowa City transportation planning) · web · checked Oct 15, 2026 Supports: Highway 1 and 6 trail system to be completed in 2028 when the Iowa DOT replaces the Highway 6 bridge over the Iowa River
- Highway 6 Trail — TrailLink · web · checked Oct 15, 2026 Supports: concrete side path east of the Iowa River, Iowa River Corridor Trail connection, shopping destinations and southeastern neighborhoods, planned extension east to Heinz Road, parking at businesses
- OpenStreetMap relation 19410791 — Highway 6 Trail · web · checked Oct 15, 2026 Supports: operator City of Iowa City, mapped length
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.