Highway 89 South Trail
Greenway in Montana · OpenStreetMap relation
Runs through Livingston · Park County
Conditions now
Loading the weather near Wineglass…
Forecast by the National Weather Service for Wineglass · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Centennial Drive mile 1.1 directions to trailhead 1
- Parking at Loves Lane mile 1.1 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Highway 89 South Trail is an asphalt path in Livingston, Montana. The City of Livingston lists it at 4.5 miles. It begins near downtown on North 5th Street and runs south along Park Street to the intersection of Highway 89 South and East River Road at Carter's Bridge.
The city's page says the City of Livingston and Park County funded the trail. It does not name an operator or maintainer, and no trail history or railroad connection appears on the page.
The OpenStreetMap record for the path is somewhat longer than the city's figure, about 5.1 miles, and is tagged as a greenway.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Livingston Mission Field, 13.6 km from the trail's middle, 34 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 48 54 64 74 86 85 74 58 45 36 Low °F 19 19 24 30 38 45 50 48 41 33 25 19 Precipitation, in 0.4 0.5 0.8 1.7 2.7 2.4 1.3 1.1 1.2 1.4 0.6 0.5 - On the National Register
- Commercial District, Livingston · historic district, listed 1979 · nomination file for Commercial District
- Old maps
USGS topographic maps of the trail's middle go back to the 1891 Livingston sheet (1:250,000); the 1951 Brisbin sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Montana
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19522829, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Livingston Area Trails - City of Livingston · organization · checked Oct 18, 2026 Supports: 4.5 miles, asphalt, route from North 5th Street along Park Street to Carter's Bridge, City and Park County funding
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.