Hike and Bike Trail
Rail-trail in Texas
Runs through Floresville · Wilson County
Conditions now
Loading the weather near Floresville…
Forecast by the National Weather Service for Floresville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Floresville El Camino Trail is a trail of about 2.5 miles (4.1 km) in Floresville, Wilson County, Texas, managed by the City of Floresville. The city calls it the Floresville El Camino Trail (formerly the Floresville Hike and Bike Trail), and OpenStreetMap still labels it Hike and Bike Trail. The National Park Service lists it as a certified site and says it was constructed in 2014 on the remains of an abandoned railroad corridor, calling it the longest section of walkable trail along El Camino Real de Los Tejas. The city describes it as a section of the El Camino Real de los Tejas National Historic Trail that follows an old railroad bed and overlaps part of a historic route used by Native Americans, Spanish settlers and cattle drives.
The trail runs from Hospital Boulevard (US Highway 97) to the Riverbend Golf Course. Historical markers along it tell its story, and the Park Service offers audio descriptions for several sites on the route. The Park Service says Floresville's development accelerated in 1883 with the arrival of the San Antonio and Arkansas Pass Railway. OpenStreetMap tags the mapped line as a cycleway designated for bicycles and walkers on an abandoned railway, with no surface tag.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Floresville, 0.9 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 65 69 76 82 88 94 96 98 92 84 74 66 Low °F 39 43 50 56 66 71 74 73 68 58 48 41 Precipitation, in 1.6 1.6 2.3 2.4 4.4 3 2.3 2.7 4.1 3.2 2.3 1.8 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1936 Floresville sheet (1:62,500); the 1961 Floresville sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Floresville El Camino Trail — National Park Service · government source · checked Oct 31, 2026 Supports: 2.5 miles (quick facts); runs from Hospital Boulevard (US Highway 97) to the Riverbend Golf Course; constructed in 2014; built on the remains of an abandoned railroad corridor; longest section of walkable trail along El Camino Real de Los Tejas; managed by the City of Floresville; certified site; historical markers; audio descriptions for several sites; Floresville's development accelerated in 1883 with the arrival of the San Antonio and Arkansas Pass Railway
- Celebrate National Trails Day on the El Camino Trail — City of Floresville · government source · checked Oct 31, 2026 Supports: name Floresville El Camino Trail (formerly the Floresville Hike and Bike Trail); section of the El Camino Real de los Tejas National Historic Trail; follows an old railroad bed overlapping a historic route used by Native Americans, Spanish settlers and cattle drives
- Hike and Bike Trail — OpenStreetMap way 1382996610 · web · checked Oct 31, 2026 Supports: highway=cycleway, bicycle=designated, foot=designated, railway=abandoned, name Hike and Bike Trail, no surface tag; one of the ways on the mapped line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.