Houghton-Chassell Rail Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Portage Township (Houghton County), Chassell Township and Chassell · Houghton County
Partly closed according to the managing agency's data2. Check the sources below before you go.
Conditions now
Loading the weather near Chassell…
Forecast by the National Weather Service for Chassell · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Michigan DNR Parks and Recreation Division.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.9 directions to trailhead 1
- Parking at Wilson Memorial Drive mile 5.2 · restrooms directions to trailhead 2
- Parking at Wilson Memorial Drive mile 5.2 · restrooms directions to trailhead 3
- Parking at 5 1/2 Street mile 5.5 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Houghton-Chassell Rail Trail is a non-motorized trail on a former railroad grade between Chassell and the city of Houghton in Houghton County, in Michigan's Upper Peninsula. The Michigan Department of Natural Resources Parks and Recreation Division owns and administers most of the route, which its trail data name the Chassell To Houghton Trail and list as a state trail in its Western Upper Peninsula Trails unit.
The DNR maps about 6.5 miles of its own grade running north from Chassell, past the Michigan Technological University golf course, to the edge of Houghton. There a 2.2-mile concrete segment of the same trail, listed as owned and administered by a university, continues west into Houghton; this site maps that end with the Houghton Waterfront Trail. The DNR's data describe the state-owned grade as asphalt, 8 to 10 feet wide, and open to hiking, all bicycles, horses, cross-country skiing and snowshoeing, with no off-road-vehicle or snowmobile route designated.
Father's Day flooding in June 2018 damaged the trail at 28 places, including the Pilgrim River Bridge. A 2019 DNR assessment found 41 percent of the trail's 48 culverts at least partly plugged and another 17 percent destroyed, and put repairs at $1.5 million to $2 million. The trail stayed closed, and in May 2021 the DNR began a $492,906 project, paid from its Recreation Improvement Fund, to repair the Pilgrim River bridge and replace five culverts between the university golf course and Old U.S. 41 in Chassell. In January 2022 The Mining Gazette reported that most of that work was finished, with two culverts and two washouts left for the spring and a ribbon-cutting planned once they were done. In February 2026 the DNR's trail data still listed the state-owned segments as temporarily closed due to a trail washout, while the university segment was listed as open.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Jacobsville, 8.6 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 25 34 46 60 70 77 75 67 53 40 28 Low °F 9 8 13 26 36 45 51 50 44 35 25 16 Precipitation, in 2 1.4 1.5 2.9 3.4 3.3 3.2 2.8 3.5 3 2.4 2.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1915 Houghton sheet (1:62,500); the 1948 Chassell sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Houghton Waterfront Trail within 0.2 mi · 4.0 mi, paved
- Jack Stevens Trail 3.2 mi away · 15.7 mi, dirt
- Bill Nicholls Trail 3.5 mi away · 42.5 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19851175, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “managing_org from Michigan DNR Statewide Railtrails”
- Statewide Railtrails layer, Chassell To Houghton Trail segments — Michigan DNR Trails open data (ArcGIS) · government source · checked Oct 15, 2026 Supports: name Chassell To Houghton Trail; state trail, Western Upper Peninsula Trails unit; Houghton County; railroad grade; DNR Parks and Recreation Division ownership and administration of about 6.5 miles (6.35, 0.10 and 0.05-mile segments); 2.19-mile concrete segment owned and administered by a university; asphalt, 8 to 10 feet wide; hiking, all bikes, equestrian, skiing and snowshoeing permitted, no ORV or snowmobile route; DNR segments 'Temporarily Closed Due To Trail Washout', university segment open (records last edited February 12, 2026); segment geometry for route direction
- Further trail repairs planned for 2021 — The Mining Gazette (January 2022) · press · checked Oct 15, 2026 Supports: most work on the Houghton-to-Chassell grade completed in a $500,000 project; two culverts and two washouts still to repair in spring; ribbon-cutting planned once complete
- DNR to begin repair work on Houghton to Chassell rail-trail in Houghton County — Michigan DNR news bulletin (May 6, 2021) · web · checked Oct 15, 2026 Supports: non-motorized trail closed since June 2018 (Father's Day) flooding; 28 damaged locations including the Pilgrim River Bridge; 2019 assessment of 48 culverts (41% partly plugged, 17% destroyed); $1.5–2 million estimate; $492,906 Recreation Improvement Fund project at six sites, bridge repair and five culverts between the Michigan Tech golf course and Old U.S. 41 in Chassell
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.