States › New York

Hudson Valley Rail Trail

Rail-trail in New York · OpenStreetMap relation

Runs through Town of New Paltz, Lloyd and Highland · Ulster County

Conditions now

Loading the weather near Highland…

Forecast by the National Weather Service for Highland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.0 mi 11.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Haviland Road mile 0 · restrooms · water directions to trailhead 1
  2. Parking at Haviland Road mile 0 · restrooms · water directions to trailhead 2
  3. Parking at Haviland Road mile 0.1 directions to trailhead 3
  4. Parking mile 0.6 directions to trailhead 4
  5. Parking at Commercial Avenue mile 1.1 directions to trailhead 5
  6. Hudson Valley Rail Trail mile 2.2 · restrooms directions to Hudson Valley Rail Trail
  7. Parking at South Riverside Road mile 3.6 · restrooms · water directions to trailhead 7
  8. Parking at NY 299 mile 5.3 directions to trailhead 8
  9. Parking at NY 299 mile 5.4 directions to trailhead 9
  10. Parking at South Elting Corners Road mile 5.4 directions to trailhead 10
  11. Parking at South Elting Corners Road mile 5.5 directions to trailhead 11
  12. Parking at Old Route 299 mile 6.2 directions to trailhead 12
  13. Parking at Old Route 299 mile 6.3 directions to trailhead 13
  14. New Paltz Park and Ride mile 6.8 directions to New Paltz Park and Ride

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Hudson Valley Rail Trail (opens in a new tab)
Photo: roadgeek_md99 · CC BY-SA 4.0 · Mapillary

About this trail

The Hudson Valley Rail Trail is a paved rail-trail in the Town of Lloyd, Ulster County, New York, running west from the Walkway Over the Hudson through the hamlet of Highland. This record maps about 3.6 miles, from Haviland Road at the Walkway's west end to Riverside Road; the trail has since been extended about 2 miles farther west, parallel to Route 299, toward New Paltz as part of the Empire State Trail. The trail occupies part of the Poughkeepsie Bridge Route, used by the Central New England, the New Haven, Penn Central and other railroads. Rail traffic over the Poughkeepsie Bridge ended after a fire on May 8, 1974, and the tracks were removed in 1983. In 1991 Ulster County seized the right-of-way west of the bridge and gave more than 5 miles of it to the Town of Lloyd. The Hudson Valley Rail Trail Association, a nonprofit started with Highland Rotary Club seed money, manages the trail; the town pays for mowing and snowplowing.

The trail opened in 1997 between Riverside Road and Vineyard Avenue. An eastern extension, funded by a 2006 state grant for a bridge, a tunnel and the path and by $3.16 million in 2009 federal stimulus money, opened on October 2, 2010, connecting the trail to the Walkway. Heading west from Haviland Road, the trail passes a red caboose at 75 Haviland Road, rock outcroppings, the Highland Rotary Pavilion with restrooms, the Black Creek Wetlands Complex and Tony Williams Park.

The trail is asphalt and 12 feet wide, open to walking, cycling, inline skating, horseback riding and cross-country skiing. Parking areas are on Haviland Road, on Commercial Avenue, at the Rotary pavilion, at Tony Williams Park and on Route 299; the Haviland Road lots are paid parking run by the Town of Lloyd. An on-road connection in New Paltz reaches the Wallkill Valley Rail Trail.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

NYNH&H Maybrook Branch, Maybrook Branch and NYNH&H former alignment (Conrail / New York New Haven & Hartford). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Poughkeepsie, 7 km from the trail's middle, 31 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353847607178838274625140
Low °F192027384958636254423325
Precipitation, in3.52.83.53.93.54.64.54.34.64.63.53.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Newburg sheet (1:62,500); the 1957 Clintondale sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9973114, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Hudson Valley Rail Trail Association — Town of Lloyd · government source · checked Oct 14, 2026
    Supports: the association is a not-for-profit dedicated to creating, maintaining, promoting and improving the trail in Highland
  3. Walkway Over the Hudson State Historic Park — New York State Parks · government source · checked Oct 14, 2026
    Supports: Hudson Valley Rail Trail continues west from the Walkway past the park office; paid parking through the Town of Lloyd on Haviland Road and at the Hudson Valley Rail Trail lot; Walkway opened October 2009
  4. Hudson Valley Rail Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: paved, 12 feet wide, Town of Lloyd, Poughkeepsie Bridge Route and its railroads, May 8, 1974 fire, Conrail permission March 1982 and track removal 1983, 1991 county seizure and transfer of more than 5 miles to Lloyd, 1997 opening between Riverside Road and Vineyard Avenue, 2006 state grant for a bridge, tunnel and eastern path, $3.16 million 2009 stimulus funding, October 2, 2010 eastern opening, about 2-mile western extension beside Route 299 for the Empire State Trail, on-road link to the Wallkill Valley Rail Trail, permitted uses, parking areas, caboose beside the Rotary pavilion
  5. Hudson Valley Rail Trail — National Recreation Trails database (2014 application) · organization · checked Oct 14, 2026
    Supports: 3.6 miles from the Walkway Over the Hudson west to Riverside Road, red caboose at 75 Haviland Road, rock outcroppings, Rotary Centennial Garden and Highland Rotary Pavilion with restrooms and picnic tables, Black Creek Wetlands Complex, Tony Williams Park, Rotary seed money, association named manager, town pays for mowing, snowplowing and utilities, 2010 connection to the Walkway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.