States › Minnesota

Hummingbird Trail

Greenway in Minnesota

Runs through Faxon Township, Jessenland Township, Henderson Township and Henderson · Sibley County

Conditions now

Loading the weather near Henderson…

Forecast by the National Weather Service for Henderson · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.4 mi 11.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North 5th Street mile 0 directions to trailhead 1
  2. Parking at Locust Street mile 0.3 directions to trailhead 2
  3. Parking at Scenic Byway Road mile 5.2 directions to trailhead 3
Church of St. Thomas, beside the trail (opens in a new tab)
Church of St. Thomas, beside the trail · Photo: Bobak Ha'Eri · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Hummingbird Trail is a paved multi-use bicycle and pedestrian trail of about 7.5 miles in the Minnesota River Valley in Sibley County, Minnesota, running from Henderson north toward Blakeley. The City of Henderson describes it as open to biking, walking, rollerblading and skiing. The Hummingbird Trail Association, a local group, promotes the trail; its site gave a spring 2026 opening, and the association scheduled a grand opening with a ribbon cutting for May 30, 2026.

The trail runs north from Henderson parallel to the Minnesota River Scenic Byway and ends at County Road 5, Faxon Road, a short distance from Blakeley. TrailLink lists parking at Bender Park in Henderson, at the Jessenland Town Hall, 32506 Scenic Byway Road, and at the Kerfoot Canopy Tour, 30200 Scenic Byway Road, about 7 miles north of Henderson. The trail is mapped here as about 7.4 miles in two pieces, beginning at North 5th Street and Locust Street in Henderson; the Mankato Free Press gives its address as 357 North Fifth Street. It does not follow a railroad.

TrailLink lists the surface as asphalt and concrete. A June 2026 TrailLink review describes the route as mostly flat and lightly rolling, with mileage markers and a bench at every mile, and notes that there is little shade outside the Henderson trailhead.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May, July and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Jordan 1ssw, 23.3 km from the trail's middle, 49 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F222640556777817872584127
Low °F5921344657615850382512
Precipitation, in0.80.91.82.84.55.13.85.23.22.71.61.2
Snow, in6.410.25.23.6000000.4311
Wildlife refuges

Passes through Minnesota Valley National Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1953 Saint Paul sheet (1:250,000); the 1957 Belle Plaine sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Hummingbird Trail — City of Henderson · government source · checked Oct 15, 2026
    Supports: multi-use bike and pedestrian trail in south-central Minnesota; biking, walking, rollerblading and skiing
  3. Home — Hummingbird Trail · organization · checked Oct 15, 2026
    Supports: scheduled to open spring 2026 in the Minnesota River Valley, grand opening May 30
  4. Henderson debuts new Hummingbird Trail with a grand opening — Mankato Free Press · press · checked Oct 15, 2026
    Supports: 7.5-mile length, address 357 N. Fifth Street, grand opening and ribbon cutting May 30 hosted by the Hummingbird Trail Association
  5. Hummingbird Trail — TrailLink · web · checked Oct 15, 2026
    Supports: Sibley County, route from Henderson north to near Blakeley parallel to the Minnesota River Scenic Byway, north end at County Road 5 Faxon Road, parking at Bender Park, Jessenland Town Hall and Kerfoot Canopy Tour, asphalt and concrete surface, June 2026 review (flat, mile markers and benches, little shade)
  6. OpenStreetMap ways for the Hummingbird Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped length in two pieces, North 5th Street and Locust Street starting points, no railroad

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.