I-270 North Multiuse Path
Greenway in Missouri · OpenStreetMap relation
Runs through Hazelwood and Florissant · St. Louis County
Conditions now
Loading the weather near Florissant…
Forecast by the National Weather Service for Florissant · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Dunn Road mile 4.3 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The I-270 North Multiuse Path is a set of paved shared-use paths along the outer roads of Interstate 270 in north St. Louis County, Missouri, built by the Missouri Department of Transportation as part of its I-270 North Project. The name comes from OpenStreetMap, where the paths are mapped as a local bicycle route. The $278 million project rebuilt more than nine miles of interstate; construction began in April 2020, and its completion was celebrated at a ribbon cutting in Hazelwood in December 2023. MoDOT says the project created 10 miles of multi-use path and other pedestrian facilities.
MoDOT describes two paths: one along Dunn Road from Lindbergh Boulevard (Route 67) to Breezy Point, and one along Pershall Road from Hanley Road and Graham Road to Old Halls Ferry Road. The project also rebuilt the interchanges at North Lindbergh, Hanley/Graham, New Florissant, Washington/Elizabeth, West Florissant, New Halls Ferry, Old Halls Ferry and Lewis and Clark, and added the first dedicated bus lane linking the North County Transit Center with St. Louis Community College.
The route mapped here is about 4.5 miles, with segments on both sides of the interstate from Lindbergh Boulevard eastward and parking on Dunn Road. The mapped path is concrete and asphalt and includes many street crossings.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
St Louis Lambert International Airport, 5.1 km from the trail's middle, 10 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 46 57 68 77 86 90 88 81 69 56 44 Low °F 24 28 37 47 58 67 71 69 61 49 37 28 Precipitation, in 2.6 2.2 3.5 4.7 4.8 4.5 3.9 3.4 3 3.1 3.4 2.5 Snow, in 5.7 4.3 2.3 0.2 0 0 0 0 0 0 0.9 3.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1927 St. Charles sheet (1:62,500); the 1954 Florissant sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesI-270 North Project (MoDOT)
Nearby trails
- Sunset Greenway 1.4 mi away · 4.3 mi, paved
- Missouri Greenway 1.4 mi away · 8.2 mi, paved
- Ted Jones Trail 2.2 mi away · 2.2 mi, paved
- Maline Greenway 2.3 mi away · 2.1 mi, paved
- Saint Vincent Greenway 3.8 mi away · 7.0 mi, paved
- St. Louis Riverfront Trail 4.3 mi away · 11.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 21270074, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- I-270 North Project Completion Celebrated at Ribbon Cutting Today — Missouri Department of Transportation (December 12, 2023) · organization · checked Oct 15, 2026 Supports: $278 million project; more than nine miles of interstate; construction began April 2020; ribbon cutting in Hazelwood; 10 miles of multi-use path and other pedestrian facilities; multi-use paths along Dunn from Lindbergh (Route 67) to Breezy Point and along Pershall from Hanley/Graham to Old Halls Ferry; outer roads; first dedicated bus lane from North County Transit Center to St. Louis Community College
- Final configuration — Missouri Department of Transportation · organization · checked Oct 15, 2026 Supports: reconstructed interchanges listed; multi-use paths along Dunn and Pershall
- I-270 North Multiuse Path (relation 21270074) — OpenStreetMap · web · checked Oct 15, 2026 Supports: route name; concrete and asphalt surface; street crossings; segments north and south of the interstate; mapped length about 4.5 miles; parking on Dunn Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.