States › New Mexico

I-40 Trail

Greenway in New Mexico · OpenStreetMap relation

Runs through Albuquerque · Bernalillo County

Conditions now

Loading the weather near Albuquerque…

Forecast by the National Weather Service for Albuquerque · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.6 mi 5.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Rio Grande Boulevard Northwest mile 1.1 directions to trailhead 1
  2. Parking at Rio Grande Boulevard Northwest mile 1.1 directions to trailhead 2
  3. Parking at Gabaldon Place Northwest mile 2.2 · water directions to trailhead 3
  4. Parking at Atrisco Drive Northwest mile 2.8 directions to trailhead 4
  5. Parking at Corto Bonito Northwest mile 2.8 directions to trailhead 5
  6. Parking at Atrisco Drive Northwest mile 2.8 directions to trailhead 6

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

I-40 Trail (opens in a new tab)
Photo: dood · CC BY-SA 4.0 · Mapillary

About this trail

The I-40 Trail is the central stretch of a paved path that accompanies Interstate 40 through Albuquerque, New Mexico. The record covers about 3.6 miles, from Coors Boulevard east to 6th Street near downtown. The stretch to the west, from Unser Boulevard to Coors Boulevard, is listed separately as the I-40 Trail West. The City of Albuquerque's trail guide describes the whole route as trail segments joined by city streets, 20.9 miles from Nusenda Community Stadium to Tramway Boulevard.

In the guide's mileage, measured from Unser Boulevard, the trail reaches the Gail Ryba Memorial Bridge over the Rio Grande at 2.4 miles. The bridge is named for a bicycling advocate and Sandia National Laboratories researcher who died in 2010, and has viewing areas over the river. At 3.2 miles the trail meets the Paseo del Bosque trail, then turns east along the south side of the interstate and crosses Gabaldon Road at 3.6 miles, in the Los Duranes community. At 4.3 miles it reaches Aspen Avenue, where a sign marks a temporary stop; riders follow Aspen Avenue and Rio Grande Boulevard, about 1,120 feet, to rejoin the trail east of Rio Grande Boulevard. The trail crosses 12th Street at 5.1 miles, passes 8th Street, and ends at 6th Street at 5.7 miles.

The guide says this segment ends there and that riders must use city streets to bypass the Big-I interchange with Interstate 25 and reach the next segment. It lists parking at the west end of Gabaldon Place and in Coronado Park. OpenStreetMap records the surface as paved. The guide dates from 2020, so the street connections may have changed.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Petroglyph Natl Mon, 4.5 km from the trail's middle, 48 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505665728192939084725949
Low °F242834415060656356433224
Precipitation, in0.60.40.70.50.40.31.51.61.60.90.60.6
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Bernalillo sheet (1:125,000); the 1954 Albuquerque West sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 20593249, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. I-40 Trail (trail guide, 2020) — City of Albuquerque Parks and Recreation · government source · checked Oct 17, 2026
    Supports: route, mileages, Gail Ryba Bridge and Ryba biography, Paseo del Bosque junction, Gabaldon Road, Aspen Avenue gap, 12th and 6th Streets, Big-I bypass, parking, 20.9-mile route
  3. OpenStreetMap relation 20593249 · web · checked Oct 17, 2026
    Supports: trail geometry, length and trailhead streets

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.