I-5 Path
Greenway in Oregon
Runs through Springfield and Eugene · Lane County
Conditions now
Loading the weather near Eugene…
Forecast by the National Weather Service for Eugene · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.1 directions to trailhead 1
- Parking at Gateway Loop mile 0.7 directions to trailhead 2
- Parking at Gateway Loop mile 0.8 directions to trailhead 3
- Parking at Gateway Loop mile 0.8 directions to trailhead 4
- Parking at Gateway Street mile 0.8 directions to trailhead 5
- Parking at Gateway Loop mile 0.8 directions to trailhead 6
- Parking at Gateway Street mile 0.8 directions to trailhead 7
- Parking at Gateway Street mile 0.8 directions to trailhead 8
- Parking at Gateway Loop mile 0.8 · restrooms directions to trailhead 9
- Parking at Gateway Loop mile 0.8 directions to trailhead 10
- Parking at Gateway Street mile 0.8 directions to trailhead 11
- Parking at Gateway Street mile 0.9 directions to trailhead 12
- Parking at Chateau Meadows Drive mile 1.1 directions to trailhead 13
- Garden Way Parking mile 1.7 directions to Garden Way Parking
(opens in a new tab) About this trail
I-5 Path is a paved shared-use path of about 2.4 miles (3.9 km) along the west side of Interstate 5 in north Eugene, Oregon. The Oregon Department of Transportation built it with the I-5 at Beltline interchange project. In 2011 ODOT presented draft plans for a bicycle and pedestrian path under or over the Beltline Highway, including six underpasses, and the agency dismissed a single bike bridge as too costly at roughly $6 million.
NBC16 reported in March 2018 that ODOT had opened a $5 million path of just over a mile east of Old Coburg Road, which connects to earlier paths at Willakenzie and resumes south of Harlow Road, leading into Garden Way.
TrailLink gives the endpoints as Old Coburg Road and South Garden Way and describes the surface as concrete and the path as lit with LED lamps. It reports a bike bridge over the interstate to Gateway Street on the east, and that to the south the path follows Garden Way under the I-5 and I-105 interchange to the Ruth Bascom Riverbank Path system near the Whilamut Natural Area and Alton Baker Park.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Eugene Mahlon Sweet Airport, 14.9 km from the trail's middle, 25 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 52 57 61 68 74 84 84 78 65 53 47 Low °F 35 35 37 40 44 48 52 52 48 42 38 34 Precipitation, in 6 4.7 4.6 3.3 2.5 1.2 0.3 0.4 1.4 3.2 6 7.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1910 Eugene sheet (1:62,500); the 1967 Eugene East sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- By-Gully Bike/Jog Path 0.3 mi away · 1.3 mi, paved
- Rosa Parks Path 0.8 mi away · 1.7 mi, paved
- Canoe Canal Trail 0.9 mi away · 1.1 mi, paved
- EWEB Bike Path 1.1 mi away · 2.6 mi, paved
- North Bank Path 1.1 mi away · 4.6 mi, paved
- South Bank Path 1.3 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eugene Weekly: News 6.16.11 · web · checked Oct 17, 2026 Supports: 2011 ODOT draft plans for a path under or over the Beltline, six underpasses, bridge dismissed at about $6 million
- New Eugene bike path opens up alongside I-5 - NBC16 · web · checked Oct 17, 2026 Supports: March 2018 opening of a just-over-a-mile, $5 million ODOT path east of Old Coburg Road, links at Willakenzie and Harlow Road to Garden Way
- I-5 Bike Path - TrailLink · web · checked Oct 17, 2026 Supports: 2.4 miles, endpoints, concrete, LED lighting, Gateway Street bike bridge, Ruth Bascom link
- OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: mapped length of the path
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.