States › Michigan

Interurban Pathway

Trolley trail in Michigan

Runs through Meridian Township and Haslett · Ingham County

Conditions now

Loading the weather near Haslett…

Forecast by the National Weather Service for Haslett · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 2.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.1 directions to trailhead 1
Interurban Pathway (opens in a new tab)
Photo: treestryder · CC BY-SA 4.0 · Mapillary

About this trail

The Interurban Pathway, spelled Inter-Urban in Meridian Township documents, is a paved path in Meridian Charter Township, east of East Lansing in Ingham County, Michigan. The township describes the existing 1.1-mile inter-urban trail between Okemos Road and Marsh Road as one link in the MSU to Lake Lansing Trail, its project to join the Michigan State University campus with the Lake Lansing parks. Ingham County Trails and Parks Millage money and the township's own pathway millage pay for much of that work.

Riders coming from campus use Phase I of the MSU to Lake Lansing Trail, opened in December 2023, and Phase II, opened in September 2024, which ends near Okemos Road and Gaylord C. Smith Court. From there a 10-foot pathway on the east side of Okemos Road, widened by the township in 2021, leads north to the Interurban Pathway, which runs east to Marsh Road. Existing pathways on Marsh and Haslett roads then lead to the Shaw Street connector toward Lake Lansing Park South.

Phase III, still in planning and design, is to run from Marsh Road just south of Haslett Road to Green Road in the northeast corner of the township, reaching Lake Lansing Park North. In 2015 the Tri-County Bicycle Association asked the township to extend the pathway east under the Marsh Road bridge when the county rebuilt it, and to install a rapid flashing beacon where the pathway crosses Okemos Road. This record maps about 1.8 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
East Lansing 4 S, 8.9 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323445587079838176624837
Low °F181927374858616052423224
Precipitation, in2.11.61.73.54.43.83.43.53.23.12.51.6
Snow, in14.17.34.20.9000000.31.87.4
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Mason sheet (1:62,500); the 1958 Grand Rapids sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. MSU to Lake Lansing Trail Project — Meridian Township · government source · checked Oct 15, 2026
    Supports: Phase I opened December 2023; Phase II opened September 2024; Phase III planning and design still underway; Phase II ends near Okemos Rd and Gaylord C. Smith Ct; existing 10-foot pathway on the east side of Okemos Road to the inter-urban pathway; funding from the Ingham County Trails and Parks Millage and the Township Pathway Millage
  3. MSU to Lake Lansing Trail Update, February 21, 2023 — Meridian Township · government source · checked Oct 15, 2026
    Supports: existing 1.1-mile inter-urban trail from Okemos Rd to Marsh Rd; Okemos Rd pathway widened in 2021; pathways on Marsh and Haslett roads to the Shaw Street connector; Phase III from Marsh Rd just south of Haslett Rd to Green Road in the northeast corner, connecting to Lake Lansing Park North; MSU campus to Lake Lansing Park South
  4. Township Board Regular Meeting minutes, August 18, 2015 — Charter Township of Meridian · government source · checked Oct 15, 2026
    Supports: Tri-County Bicycle Association requests to extend the Inter-urban Pathway east under the Marsh Road bridge during the county bridge project and to install a rapid flashing beacon at the Okemos Road crossing

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.