Iosco Exploration Trail
Greenway in Michigan
Runs through Oscoda Township, Wilber Township, Au Sable Township (Iosco County) and Au Sable · Iosco County
Conditions now
Loading the weather near Au Sable…
Forecast by the National Weather Service for Au Sable · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Mill Street mile 0 directions to trailhead 1
- Parking at East River Road mile 2.1 directions to trailhead 2
- Parking at East River Road mile 2.5 directions to trailhead 3
- Parking at East River Road mile 2.7 directions to trailhead 4
- Parking at East River Road mile 5.3 directions to trailhead 5
- Boat Launch mile 6.6 directions to Boat Launch
- Parking at East River Road mile 7.7 · restrooms directions to trailhead 7
(opens in a new tab) About this trail
The Iosco Exploration Trail is a non-motorized path in Iosco County, Michigan, built in phases by the Iosco Exploration Trail, a 501(c)(3) nonprofit that coordinates the county's cities and townships on the project. As planned, it would run 44 miles from Oscoda and Au Sable to Hale and form part of Michigan's Iron Belle Trail. The nonprofit also takes on maintenance of the finished trail.
The first major section ran from downtown Oscoda to the Oscoda school complex; the U.S. Forest Service approved a hard-surfaced path, 10 feet wide, south of River Road between Grass Lake Road and the schools. Phase 3 carries the trail 5.3 miles from the schools through the national forest and Foote Site Village to the entrance of Old Orchard Park Campground on Foote Pond. In 2021 it was described as a 10-foot-wide gravel path beside the River Road National Scenic Byway, and in early 2022 its $2.5 million cost was fully committed from state transportation and natural-resources grants, Iron Belle funds, Iosco County, Oscoda Township and a crowdfunding campaign. In March 2022 the Forest Service signed a decision authorizing 28.3 miles of non-motorized trail on national forest land, roughly parallel to River Road and part of M-65.
TrailLink now lists 7.4 miles in two sections with a gap between them: about 6 miles from Old Orchard Park east, mostly beside River Road, to West Mill Street in Oscoda, passing Oscoda High School, where it serves as a Safe Route to School; and 1.2 miles from Long Lake Park in Hale. Surfaces include asphalt, concrete, crushed stone and boardwalk, and parking is at Old Orchard Park, 883 East River Road. Our record, about 8.2 miles, covers the Oscoda–Old Orchard Park section.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
E Tawas, 17.5 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 32 41 52 65 75 80 79 72 59 46 35 Low °F 13 13 21 32 44 53 58 57 49 38 29 20 Precipitation, in 2.1 1.8 1.9 3.4 3.2 3.3 3.1 3 2.9 3 2.5 2.1 Snow, in 14.3 12.4 7.2 2.9 0 0 0 0 0 0.1 2.6 9.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Tawas City sheet (1:250,000); the 1959 East Tawas sheet (1:62,500) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationIosco Exploration Trail (nonprofit)
- RedditSearch Reddit: r/Michigan
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Iosco Exploration Path Phase I, Project #46070 — Huron-Manistee National Forests (USDA Forest Service) · government source · checked Oct 15, 2026 Supports: hard-surface path, 10-ft tread, south of the River Road right-of-way between Grass Lake Road and Oscoda Schools
- Iosco Exploration Trail Project, Project #58888 — Huron-Manistee National Forests (USDA Forest Service) · government source · checked Oct 15, 2026 Supports: authorizes 28.3 miles of non-motorized trail as part of the Iron Belle Trail system; Forest Service segment roughly parallels River Road and part of M-65; decision signed March 7, 2022
- Crowdfunding campaign launched for the 'Iron Belle Trail: Iosco Exploration Trail' project in Oscoda — Michigan Economic Development Corporation (July 2021) · organization · checked Oct 15, 2026 Supports: IET nonprofit 501(c)(3) leading collaboration between cities and townships; planned 44-mile pathway from Oscoda/AuSable to Hale; part of the Iron Belle Trail; Phase 3 5.3-mile 10-ft gravel path adjacent to the River Road National Scenic Byway
- Iosco Exploration Trail (chair's reflections, Jan. 7, 2022 public notice) — Plainfield Township · web · checked Oct 15, 2026 Supports: first section from downtown Oscoda to the Oscoda School Complex completed; Phase 3, 5.3 miles from the school through the national forest and Foote Site Village to Old Orchard Park Campground on Foote Pond; $2.5 million with TAP, MNRTF, Iron Belle Trust Fund, Iron Belle Trail Fund, Iosco County, Oscoda Township and Patronicity funds committed; IET responsible for future maintenance; 501(c)(3)
- Iosco Exploration Trail — TrailLink · web · checked Oct 15, 2026 Supports: 7.4 miles in two sections with a gap; 6-mile section from Old Orchard Park east along River Rd. to W. Mill St. in Oscoda passing Oscoda High School (Safe Routes to School); 1.2-mile section at Long Lake Park; surfaces asphalt, boardwalk, concrete, crushed stone; parking at Old Orchard Park, 883 E. River Rd.
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.