States › Iowa

Iowa River Trail - North Liberty to Mehaffey Bridge

Greenway in Iowa · OpenStreetMap relation

In Johnson County

Conditions now

Loading the weather near North Liberty…

Forecast by the National Weather Service for North Liberty · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.3 mi 3.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mehaffey Bridge Road Northeast mile 1.8 directions to trailhead 1
  2. Parking at Mehaffey Bridge Road Northeast mile 2 directions to trailhead 2
  3. Parking at Mehaffey Bridge Road Northeast mile 2 directions to trailhead 3
Iowa River Record High Water Level Flood Sign (opens in a new tab)
Iowa River Record High Water Level Flood Sign · Photo: Tony Webster from Minneapolis, Minnesota, United States · CC BY 2.0 · Wikimedia Commons

About this trail

This is the Mehaffey Bridge Trail Segment, the northern end of the Iowa River Trail, a 16-mile paved multi-use network linking Iowa City, Coralville and North Liberty in Johnson County, Iowa. Johnson County Conservation maintains the segment, which it lists as 2.3 miles. From North Liberty it follows Mehaffey Bridge Road to the Mehaffey Bridge over the Coralville Reservoir and ends at the east side of the bridge, near the entrance to the Sugar Bottom Recreation Area and its mountain bike trails. The county's extension between Cedar Springs Drive and Coralville Lake opened in July 2019. The Mehaffey Bridge Boat Ramp is listed as a trailhead.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cedar Rapids Municipal Airport, 17.5 km from the trail's middle, 17 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283346607180838175624633
Low °F111627385060636052402817
Precipitation, in0.91.223.64.25.64.44.13.42.921.6
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Cedar Rapids sheet (1:62,500); the 1968 Ely sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18954299, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Iowa River Trail (trail sheet, 2021) — Johnson County Conservation · government source · checked Oct 14, 2026
    Supports: 16-mile network, Mehaffey Bridge Trail Segment along Mehaffey Bridge Road, northern terminus at east side of bridge near Sugar Bottom Recreation Area and its mountain bike trails, county maintenance, 2.3 miles, Mehaffey Bridge Boat Ramp trailhead
  4. Paved Trails — Johnson County Conservation · government source · checked Oct 14, 2026
    Supports: segment stretches from North Liberty to the east side of the Mehaffey Bridge
  5. Mehaffey Bridge Road Trail Extension Open For Use — Patch (Johnson County press release, July 26, 2019) · press · checked Oct 14, 2026
    Supports: extension between Cedar Springs Drive and Coralville Lake substantially complete and open in July 2019

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.