States › Michigan

Iron Belle Trail

Rail-trail in Michigan

Runs through Ironwood, Ironwood Township, Bessemer Township, Bessemer and Ramsay · Gogebic County

Conditions now

Loading the weather near Bessemer…

Forecast by the National Weather Service for Bessemer · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Iron Belle Trail is a set of two trails that will span the state of Michigan. The two trails, one for hiking and one for biking, connects Ironwood in the Upper Peninsula and Belle Isle State Park in Detroit. When complete, the hiking trail will be 1,204 miles (1,938 km) long and the biking trail is 828 miles (1,333 km) long. The Michigan Department of Natural Resources is coordinating the planning and construction of the missing trail segments.

From Wikipedia3 (CC BY-SA). Help improve the article and it improves here.

Managed by Michigan DNR Parks and Recreation Division.25

Length
9.7 mi 15.7 km1
On former railbed
7.2 mi 74%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 6.8 directions to trailhead 1
  2. Parking at North Suffolk Street mile 9.2 directions to trailhead 2
2009-0617-ChicagoNorthwesternDepot -Ironwood (opens in a new tab)
2009-0617-ChicagoNorthwesternDepot -Ironwood · Photo: Bobak Ha'Eri · CC BY 3.0 · Wikimedia Commons

About this trail

This record covers the westernmost paved section of the Iron Belle Trail, Michigan's state-designated trail between Ironwood in the Upper Peninsula and Belle Isle State Park in Detroit. The full Iron Belle crosses 48 counties over more than 2,000 miles, with a 1,204-mile hiking route and an 828-mile bicycle route, and the Michigan Department of Natural Resources coordinates planning and construction of its missing segments. The Ironwood section was built in phases with the Michigan Western Gateway Trail Authority among its backers.

The paved trail runs about 9.7 miles from the Montreal River, the Michigan–Wisconsin state line at Ironwood, east through Bessemer to Ramsay. Phase 1, 2.5 miles in Ironwood, was built in 2014 for $400,000. The $1.6 million second phase, completed in 2016, carried the trail 4.2 miles farther east to the Moore Street trailhead in Bessemer. The third phase, about 3 miles to Ramsay, cost just under $1.5 million, paid for by Department of Natural Resources grants, state and federal transportation programs, a $200,000 match from the Gogebic Range Health Foundation and the trail authority; it opened to the public in September 2020. East of Moore Street the route follows an old railroad grade, leaves it for an old roadbed through the woods to Anvil Road, returns to the grade, then bypasses the sewage lagoons and ends at Ramsay Road across from the Keystone Bridge. A gravel path links that end to the park behind the Bessemer Township Hall.

The trail crosses several railroad bridges and is used for running, walking and cycling, and for skiing and snowshoeing in winter. The Bridges & Bluffs Half-Marathon is held on it each September. Extending the trail east to Wakefield was named in 2020 as the next local goal.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ironwood, 7.8 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F202436486372767567533725
Low °F4414284151565446352311
Precipitation, in21.523.13.83.94.23.83.842.92.4
Snow, in43.130.923.911.71.90000.3624.143.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Ironwood sheet (1:48,000); the 1955 Bessemer sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In 2026 one rider said the Iron Belle's official route across the Upper Peninsula follows busy US-2, with a wide but loud, debris-littered shoulder; another commenter who had driven it advised against it. r/bicycletouring, Feb 2026
  • Two riders in 2026 said biting insects in the Upper Peninsula were severe from mid-June to late July, with deer flies catching touring bikes except on downhills. r/bicycletouring, Feb 2026
  • Two riders in 2026 said Upper Peninsula ATV and snowmobile trails were loose, sandy or mostly impassable for bike travel, and one warned against relying on them. r/bicycletouring, Feb 2026
7 Reddit threads about this trail, Apr 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. “Iron Belle Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  4. Wikidata Q19876473, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  5. Michigan DNR Parks and Recreation Division · Official site · checked Oct 31, 2026
  6. Iron Belle Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: Ironwood to Belle Isle State Park endpoints; more than 2,000 miles across 48 counties; 1,204-mile hiking route and 828-mile biking route; Michigan DNR coordinates planning and construction of missing segments
  7. Iron Belle Trail — Ironwood Area Chamber of Commerce · organization · checked Oct 15, 2026
    Supports: paved trail from the Montreal River Bridge at the state line through Ironwood and Bessemer to Ramsay; railroad bridges; running, walking, biking, skiing and snowshoeing; Bridges & Bluffs Half-Marathon in September
  8. Ribbon cutting celebrates new trail segment — The Daily Globe (Sept. 12, 2020) · press · checked Oct 15, 2026
    Supports: phase 1 of 2.5 miles in Ironwood built 2014 for $400,000; $1.6 million second phase completed 2016, 4.2 miles farther east to Moore Street in Bessemer; 3-mile extension to Ramsay costing just under $1.5 million; funding sources including DNR grants, MDOT/FHWA programs, Gogebic Range Health Foundation $200,000 match and the Michigan Western Gateway Trail Authority; opened to the public in September 2020; Wakefield as next goal
  9. Iron Belle extension project nears completion — The Daily Globe (Aug. 8, 2020) · press · checked Oct 15, 2026
    Supports: route east of Moore Street on old railroad grade, old roadbed to Anvil Road, bypass of sewage lagoons, end at Ramsay Road across from the Keystone Bridge; gravel path to the park behind the Bessemer Township Hall; 9.7 miles from the Montreal River in Ironwood to Ramsay

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.